You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEEP WATER CTD HANDLING SYSTEM

    SBC: Product Planning, Inc.            Topic: N/A

    THERE IS A LONG OVERDUE NEED FOR BETTER METHODS TO HANDLE CABLE IN A SURGING SEA. PRESENT EQUIPMENT WAS DESIGNED FOR DECK OR SHORE USE AND DOES NOT ADDRESS THE IMPACT OF WAVE FORCE. WHAT IS REQUIRED OF TODAY'S SYSTEM IS A LOW INERTIA,HIGH RESPONSE CAPSTAN TO ISOLATE THE SEA/CTD PACKAGE FROM THE SHIP. LARGE DRUM WINCHES AND TENSION DEVICES USE BRUTE RESTRAINING FORCE WITH THE CABLE ACTING AS THE HI ...

    SBIR Phase II 1988 Department of Commerce
  2. ANALYSIS OF STATE-OF-THE-ART METHODS FOR CONTAINMENT INTEGRATED LEAK RATE TESTING

    SBC: Sentry Equipment Corp.            Topic: N/A

    THE J.P. LANGAN & ASSOCIATES, INC/SENTRY EQUIPMENT CORP. TEAM WILL DEVELOP TWO MODELING METHODS TO ENHANCE ILRT TESTING CONFIDENCE. WE INTEND TO ESTABLISH A MATHEMATICAL RELATIONSHIP BETWEEN CONTAINMENT SIZE AND THE FREQUENCY DURATION BETWEEN DISCRETEDATA POINTS FOR IDEAL AUTOMATED DATAACOLLECTION AND EVALUATION. WE WILL SUPPORT THE PROPOSED APPENDIX J BY ANALYZING 20 TYPEA AND VERIFICATION TESTS ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government