You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: Advanced Engines Development Corporation            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  2. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
  3. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  4. Self-Contained Sub Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 812N

    The goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  5. AIRCRAFT SAFTEY

    SBC: SYSTEMS & ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government