You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  2. Low-cost Low-power Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More that 52% of the U.S. highway congestion in urban areas is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, low-cost and efficient highway incident detection and warning systems. Several solutions have been proposed but none could meet the requirements of transportation authorities. Central Signal, funded by federal agencies, has done ...

    SBIR Phase I 2008 Department of Transportation
  3. Locking Mechanism for Rotating Seats

    SBC: Kustom Seating Unlimited Inc. (KSU)            Topic: 07FR1

    Research is proposed to develop a locking mechanism for intercity (Amtrak) rotating seats that can be retro-fit to existing seats. Current intercity rail seats, according to the National Transportation Safety Board (NTSB), present a safety hazard to the riding public. Post accident investigations show that passenger rail seats were found to have been uncontrollably rotated even though current se ...

    SBIR Phase I 2008 Department of Transportation
  4. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: 01FR1

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The truck uses a rigid frame and an indpendent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehi ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government