You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel CO2 Gas Sensors for Autonomous Measurement of Ocean Carbon

    SBC: DIOXIDE MATERIALS, INC.            Topic: 82

    The objective of the proposed work is to determine whether Dioxide Materials' miniature C02 sensors have the potential to be adapted for autonomous measurement of ocean carbon. The existing sensors have many advantages for measurements of ocean carbon. They are much smaller and less costly than the existing sensors, work with much smaller gas samples, and use much less power. The sensors were d ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Increasing the Availability and Utility of Weather and Climate Data to Meet Decision Maker Needs

    SBC: Riverside Technologies Inc.            Topic: 84

    Climate variability and the increased frequency of climate-related risks are redefining how communities address urban development and planning, Better storm risk assessment will lead directly to better preparedness which will save lives, reduce costs, and increase resiliency. Riverside proposes a data integration and visualization tool that will enable communities to assess climate-related risks, ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Self-Contained Sub-Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 81

    The goal of this project is to develop, implement, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, mapping, and survey applications. The main feature of the proposed DGNSS solution is that it leverages GNSS reference data from existing NOAA's Continuously Operational Ref ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Delivering a Solar Flare Forecast Model that Improves Flare Forecast (Timing and Magnitude) Accuracy by 25%

    SBC: NORTHWEST RESEARCH ASSOCIATES, INC.            Topic: 94

    NorthWest Research Associates proposes to develop a prototype system to forecast solar flares for NOAA/Space Weather Prediction Center. Many activities and technological systems prevalent in today’s society—air traffic control and air travel, the power grids, communications, deep-water drilling operations, human spaceflight—are vulnerable to the effects of flares from our Sun, which can sud ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  5. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  7. AIRCRAFT SAFTEY

    SBC: SYSTEMS & ELECTRONICS, INC.            Topic: N/A

    SYSTEMS & ELECTRONICS, INC. (SEI) IS PROPOSING A PROGRAM OF RESEARCH AND DEVELOPMENT TO MANUFACTURE, TEST, INSTALL AND EXPERIMENT WITH AN EFFICIENT, LIGHTWEIGHT, LOW-COST, RELIABLE AIRFRAME CUMULATIVE FATIGUE RECORDING DEVICE THAT CAN EFFECTIVELY BE USED IN MEASURING AIRCRAFT USAGE. THE PROPOSED SYSTEM WILL BE USED ALONG WITH ACCELEROMETERS INSTALLED ABOARD THE AIRCRAFT AND WILL RECORD AND SEPARAT ...

    SBIR Phase II 1994 Department of Transportation
  8. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  9. AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL.

    SBC: First Omega Group Inc            Topic: N/A

    AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL. THE FIRST OMEGA GROUP, INC. PROPOSES TO DEMONSTRATE THE APPLICABILITY OF THIS CONCEPT TO ENABLE THE CONSTRUCTION OF INSTRUMENTATION THAT AUTOMATICALLY DETERMINES THE ONSET, DURATION, ACCU MULATION AND DISSOLUTION OF ICING ON AIRPORT RUNWAYS, PARKEDAIRCRAFT, AIRPORT NAVIGATIONAL AID STRUCTURES, ETC. TH ...

    SBIR Phase I 1985 Department of Transportation
  10. MDA PROPOSES TO DESIGN, TEST AND MARKET A NEW DRIVERS LICENSE TEST UTILIZING THE INTERACTIVE CAPABILITIES OF F COMPUTER MEDIATED VIDEODISC SYSTEMS.

    SBC: Media Design Associates, Inc.            Topic: N/A

    MDA PROPOSES TO DESIGN, TEST AND MARKET A NEW DRIVERS LICENSE TEST UTILIZING THE INTERACTIVE CAPABILITIES OF F COMPUTER MEDIATED VIDEODISC SYSTEMS. CURRENT WRITTEN DRIVERSTESTS WILL BE ANALYZED AND MORE VALID TEST ELEMENTS WILL BE DESIGNED TO MEASURE UNDERSTANDING IN THESE CONTENT AREAS. THE NEW COMPUTER MEDIATED VIDEODISC SYSTEMS PERMIT THE TESTING OF PERFORMANCE. THE SIMULATION POSSIBILITIES WIL ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government