You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Novel CO2 Gas Sensors for Autonomous Measurement of Ocean Carbon
SBC: DIOXIDE MATERIALS, INC. Topic: 82The objective of the proposed work is to determine whether Dioxide Materials' miniature C02 sensors have the potential to be adapted for autonomous measurement of ocean carbon. The existing sensors have many advantages for measurements of ocean carbon. They are much smaller and less costly than the existing sensors, work with much smaller gas samples, and use much less power. The sensors were d ...
SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration -
Self-Contained Sub-Centimeter Positioning Platform
SBC: TRUNAV LLC Topic: 81The goal of this project is to develop, implement, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, mapping, and survey applications. The main feature of the proposed DGNSS solution is that it leverages GNSS reference data from existing NOAA's Continuously Operational Ref ...
SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration -
Welding High Performance Bridge Steel with a Pulsed Energy Source
SBC: KAI, LLC Topic: 132FH1This proposal is in response to announcement DTRT57-13-R-SBIR2 in the area 13.2-FH1, Development of Innovative Welding for High Performance Bridge Steel. It is proposed to use Homopolar Generator (HPG) Welding to join the high performance bridge steel in the 3” by 30” cross sections mentioned in the announcement in under 1 second. All of the energy required to perform the weld is stored in the ...
SBIR Phase I 2014 Department of Transportation -
Improved Source Location Using Sensor-Arrays
SBC: Cyltek, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Innovative Solutions to Improve Performance of Railroad Switch Frogs & Turnouts
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Conceptual Design of a 'Tri-Coupler' System
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Broken Rail Detection
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Pavement Ice Detection
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Field Testing A Vehicle-Based Animal Deterrent
SBC: Wph Associates Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
HOLD
SBC: Airdex Corpon Topic: N/ATHE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...
SBIR Phase I 1985 Department of Transportation