You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Short-Wave-Infrared (SWIR) Night Glow Photon-Counting Integrated Circuit (PCIC) Focal Plane Array (FPA) Detectors and Night Vision Cameras

    SBC: Wavefront            Topic: SOCOM12002

    Almost all intelligence, surveillance, and reconnaissance (ISR) platforms and all small agile munitions need high-sensitivity night vision imagers for situational awareness and for target identification, tracking and discrimination. The requirements of situational awareness, responsiveness and weapon precision are ever more stringent in current and future urban warfare, where minimum collateral da ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  2. A Low-Cost IR-Enhanced Video System for Early Obstacle Warning

    SBC: CREARE LLC            Topic: N/A

    More than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...

    SBIR Phase I 2001 Department of Transportation
  3. DIFFERENTIALLY DRIVEN GENERATORS (DDG)

    SBC: Transmission Technology Co Inc            Topic: N/A

    TRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...

    SBIR Phase I 1985 Department of Transportation
  4. OPERATIONS

    SBC: Transmission Technology Co Inc            Topic: N/A

    COST OF CARGO HANDLING OPERATIONS CAN BE REDUCED BY EQUIPMENT THAT USES LESS TIME AND ENERGY TO PERFORM AND RANDREQUIRES LESS MANPOWER TO OPERATE, MONITOR, AND MAINTAIN. ONE OBJECTIVE OF THIS PROPOSAL IS TO EVOLVE A PRELIMINARY DESIGN OF A REPRESENTATIVE PIECE OF MACHINERY, NAMELY A MOORING/WARPING AUTOMATIC TENSIONING WINCH USING ADVANCED ELECTRO-MECHANICAL TECHNOLOGY, ELIMINATING HYDRAULICS AND ...

    SBIR Phase I 1985 Department of Transportation
  5. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  6. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  7. WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT.

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT. THIS IN TURN LEADS TO THE REQUIREMENT FOR AN INTEGRATED TRACK MAINTENANCEFORECASTING AND PLANNING SYSTEM THAT WILL ENABLE TRACK MAIN TENANCE SUPERVISORS TO EFFECTIVELY PLAN THEIR MAINTE ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government