You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Viability of Crowd-Source Transit Information Systems
SBC: View Update Media LLC Topic: 121FT1The company is commercializing a mobile social computing system named Tiramisu (“pick me up” in Italian) that is intended to connect riders and transit service providers. It supports a variety of collaboration mechanisms designed to improve the experience of riders in a transit service and improve the service provided by service operators. The system has been designed using current knowledge i ...
SBIR Phase I 2012 Department of Transportation -
Integrated Diver Monitoring System
SBC: CREARE LLC Topic: SOCOM11002Special Warfare Combat Swimmers operate in a hostile environment characterized by excessive physiologic demands and complete reliance on their equipment. Diver safety and situational awareness can be greatly improved by an integrated system capable of monitoring both diver physiologic status and breathing apparatus operation. During the course of this project Creare will develop an Integrated Di ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001Solid State Scientific Corporation (SSSC) is pleased to propose the design of a single-board, integrated Hostile Fire Indication (HFI) system with the nominal size, weight, and power constraints for operation as an adjunct sensor within the AN/AVR-2B(V) Laser Warning Set. Work on Phase I will consist of the preliminary design of a single circuit board that includes an uncooled, Commercial Off-The ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Ultra-Compact Power System for Small Unmanned Aerial Systems
SBC: CREARE LLC Topic: SOCOM11003Air-launched, small unmanned aerial systems (SUAS) offer the potential for a tremendous increase in airborne sensing and ground support capability. However, breakthrough power technology is needed to enable these systems to reach their potential. We propose to develop a power system designed to meet the extremely challenging performance, operational, and environmental requirements for service on ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Composite Cylinder Life-Cycle In-Service Assessment
SBC: WavesinSolids LLC Topic: 101PH1Current inspection, maintenance and lifetime estimation practices for composite cylinders have been adopted from earlier NASA research. WavesinSolids LLC are proposing a technological based on an acoustic emission (AE) technique for the in-service testing of composite cylinders. The approach will establish the correlation between AE activity and intensity metrics and the stress intensity factor, a ...
SBIR Phase I 2011 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 2001 Department of Transportation -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
POWDER SYSTEM
SBC: Energy & Minerals Research Topic: N/ATWO YEARS AGO IT WAS EXPERIMENTALLY SHOWN THAT CHARGED WATERDROPLETS COULD KNOCK-DOWN SMOKE RAPIDLY. WE NOW PROPOSE TO TO DEVELOP A DEVICE WHICH USES A CHRGED FINELY POWERED SOLIDAEROSOL TO KNOCK-DOWN SMOKE. USING A SOLID INSTEAD OF A LIQUID AEROSOL HAS SIGNIFICANT ADVANTAGES. THE SOLID PART ICLES CAN BE PRE-FORMED IN A READY-TO-USE STATE. PARTICLE SIZE CAN BE RIGOROUSLY CONTROLLED AND HAVE OPTIMU ...
SBIR Phase I 1985 Department of Transportation -
Evaluation of Composite Joints in General Aviation (GA) Structures (MSC P1S21-118)
SBC: MATERIALS SCIENCES LLC Topic: N/ASimple, yet accurate engineering analytical tools will be developed for the evaluation of strength, durability and damage tolerance of composite bonded joints used in General Aviation (GA) structures with due consideration to adherend and adhesive thickness variations used (or present) in such joints. These tools and other available ones will be exercised for typical joint GA joint configurations ...
SBIR Phase I 2001 Department of Transportation -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission