You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Clean, Green, ChemBio Defense/Fire Retardant Process Using Nanotechnology

    SBC: Aqua Resources Corporation            Topic: SOCOM10007

    NanoPlatelets (NPs) created of metal hydroxides present entirely new and previously unknown set of morphologes/properties and are a virtually new frontier and unstudied field of Material Science and may be leveraged into many of todays DoD and Comercial Technical Challenges and applications. Case in point is SOCOM's Defense Mitigation and Decontamination of military aircraft and equipment and ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. Compact, Covert Periscope with 360 Degree Simultaneous Day/Night Coverage

    SBC: 3 Phoenix, Inc.            Topic: SOCOM10003

    3 Phoenix, Inc. proposes to build, integrate, test and deliver a modular non-rotational high definition compact periscope system for use on submerged or surface vehicles. Our design is compliant with the Modular Open Systems Approach (MOSA) as it is based on commercial interface standards and commercially available electronics. The system will provide instantaneous 360-degree field of view in an ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  3. Multi-Spectral Combat ID Beacon

    SBC: Diffraction, Ltd            Topic: SOCOM10008

    For Phase 2, Diffraction proposes to develop a small, lightweight, low profile, battery powered multi-spectral combat ID beacon. The beacon will output enough energy in the mid wave infrared (MWIR) bands to be visible to nearly all US and allied targetin

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines

    SBC: Generation 2 Materials Technology Llc            Topic: 111PH2

    There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...

    SBIR Phase II 2012 Department of Transportation
  5. Advanced Longevity System for the Environmental Protection of Electrochromic Materials

    SBC: ECLIPSE ENERGY SYSTEMS, INC.            Topic: AF06019

    Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  6. Intelligent Dimension Evaluation and Alerting System (IDEAS)

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 111FH3

    Low or narrow bridges are often hit by legal-sized commercial vehicles and oversize vehicles often strike regulation bridges. In both cases the accidents result in extensive property damage, possible personal injuries and even death, and increased traffic congestion. Past attempts to warn drivers of risks for bridge hits have failed due to inaccurate measurement, high rates of false alarms, or s ...

    SBIR Phase II 2012 Department of Transportation
  7. Mesoporous CO2 Scrubber Materials for Underwater Breathing Apparatus Platforms

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: SOCOM10002

    Current and future military forces are moving to be lighter, faster, and stealthier in order to maintain an operational advantage. For example, underwater combat activities require light and small equipment for the submarines or the divers to efficiently complete the assigned missions. Among those systems required by underwater activities, breathing air supply equipment is especially critical fo ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  8. Enhanced Small Arms Ammunition

    SBC: LIBERTY AMMUNITION, INC.            Topic: SOCOM06008

    Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  9. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  10. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    Portable electronic equipment, whether military or civilian, now typically contain rechargeable batteries. Often it is inconvenient or impossible to connect this equipment to conventional battery charging sources. It would be highly desirable to incorporate a built-in battery recharging source with the equipment to overcome this shortcoming. Ideally this recharging source should not take up any ex ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government