You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB).

    SBC: Ei International Inc.            Topic: N/A

    ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB). THE REQUIRED INFORMATION INCLUDES GEOMETRIC AND OPERATING DATA FOR THE PRIMARY SYSTEM SECONDARY SYSTEM, BALANCE OF PLANT, AND THE TRIP AND CONTROL SYSTEMS. ALTHOUGH, EVERY COMMERCIAL REACTOR IN THE U.S. HAS UNIQUE DESIGN FEATURES, MANY SHARE A COMMON BASIS BY WHICH THEY CA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
  2. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  3. HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS

    SBC: ENGINEERING SCIENCE ANALYSIS CORP            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    THE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  5. HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS

    SBC: ENGINEERING SCIENCE ANALYSIS CORP            Topic: N/A

    THE ACCIDENT AT TMI DEMONSTRATED THAT LARGE QUANTITIES OF HYDROGEN CAN BE GENERATED AS A RESULT OF ZIRCONIUM-STEAM OXIDATION REACTION, WHICH POSES A HYDROGEN BURN THREAT IN LWR CONTAINMENTS. THE RATES AT WHICH THE CORE HEATS UP AND WHICH HYDROGEN IS GENERATED DEPENDS UPON THE ZIRONIUM-STEAM REACTION RATE, WHICH IN TURN IS INFLUENCED BY LOCAL STEAM SMSTARVATION AND HYDROGEN BLANKETING EFFECTS. THE ...

    SBIR Phase II 1986 Nuclear Regulatory Commission
  6. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    CSA PROPOSES TO DESIGN AND IMPLEMENT A STEADY-STATE SOLUTION FOR THE COMPLETE SYSTEM OF EQUATIONS SOLVED IN EITHER THE TRAC/PF1, TRAC/BD1, OF RELAP5 CODES. THE STEADY-STATE SOLUTION WILL UTILIZE THE STEADY-STATE FORM OF THE MODEL EQUATIONS AND WILL UTILIZE EXISTING EQUATION SOLVERS TO THE EXTENT POSSIBLE. ALL TIME-DEPENDENT CONSTITUTIVE AND COMPONENT MODELS WILL BE INCLUDED IN THE SOLUTION TO ENSU ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  8. Solar Roadways

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    Solar Roadways Incorporated envisions replacing current asphalt surfaces with modular Solar Road Panels: structurally-engineered solar panels that can be driven upon. The roadway will generate electricity, become our nation's power grid, make all-electric vehicles practical, and transport rainwater to desired locations. Collecting solar energy for just four hours/day would produce three times m ...

    SBIR Phase I 2009 Department of Transportation
  9. Solar Roadways

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...

    SBIR Phase II 2011 Department of Transportation
  10. Self-Sustaining, Intelligent Pavement Systems

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with modular Solar Road Panels: structurally-engineered solar panels that can be driven upon. The roadwa ...

    SBIR Phase II 2016 Department of Transportation
US Flag An Official Website of the United States Government