You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Active Termination of Lithium-Ion Battery Fires and Thermal Runaway

    SBC: MARINE FIRE SYSTEMS LLC            Topic: 21PH1

    "Li-ion batteries have a major downside which is their potential to initiate fires, escalate to thermal runaway increasing the violence, and to possibly explode.Traditional fire extinguishing agents either perform poorly or are impractical on these high-energy fires.Two innovations, in combination, are proposed for research and development.Pyrotechnic aerosol extinguishing agents will be proven hi ...

    SBIR Phase I 2021 Department of Transportation
  2. TAPCO Physical Intervention Solution for Wrong-way Drivers on Ramps

    SBC: TRAFFIC AND PARKING CONTROL CO., INC.            Topic: 20FH1

    Wrong-way crashes are considered among the most lethal types of traffic incidents because of their head on characteristics and because they usually involve high rates of speed. To reduce the frequency of high-speed incidents, it is necessary to stop a wrong-way driver as soon as possible. The sooner a wrong-way driver is stopped, the less likely they are to cause a high-speed event. TAPCO believes ...

    SBIR Phase I 2020 Department of Transportation
  3. Development of “Permit Wizard” Software for AssistedPermit Application Completion

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: 833

    TECHNICAL ABSTRACT: The objective of this project is to research the technical feasibility of designing a software tool “Permit Wizard” that will automate the process for aquamarine permit application submittal, review, approval/disapproval and issue (including collection of fees). Aquaculture producers are currently faced with slow, complex, and often confusing permitting processes that must ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: Advanced Engines Development Corporation            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  5. Development of a GPU-based High Performance Community Radiative Transfer Model

    SBC: Hyper Sensing, LLC            Topic: 835D

    Computation of the radiative transfer model for a hyperspectral sounder with thousands of spectral channels is very time-consuming. Consequently, operational data assimilation systems can assimilate only a few hundred channels. The radiative transfer model is very suitable for GPU implementation to take advantage of GPU massively parallel computing capability, where radiances at various channels c ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Safe Track Protection and Advance Warning System

    SBC: WAVETRONIX LLC            Topic: 082FH1

    To improve safety and efficiency on high-speed signalized intersections a dilemma zone protection system has been designed to automatically configure site-specific protection boundaries on both main-street approaches by continously tracking vehicles within up to 1000 feet of each stop line. The system will further customize and refine protection by continously estimating the probability of a seve ...

    SBIR Phase I 2009 Department of Transportation
  8. A Higher Performance Traffic Detector Built on SmartSensor HD and Multi-Beam Radar Technology

    SBC: WAVETRONIX LLC            Topic: 091FH3

    Wavetronix currently sells the SmartSensor HD radar detection which is the highest performance above ground detector currently available. However, the count, speed and classification accuracy can be significantlly improved by employing multi-beam radar technology which we have recently developed. Multi-beam radar technology allows multiple radars to be used cost effectively inside a single senso ...

    SBIR Phase I 2009 Department of Transportation
  9. Cost Effective, Power Efficient, Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More than 52% of U.S. urban highway congestion is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, cost-effective and efficient highway incident detection and warning systems. Several solutions have been proposed but none could satisfy requirements of transportation authorities. Central Signal's research and development, grounded in mor ...

    SBIR Phase II 2009 Department of Transportation
  10. Low-cost Low-power Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More that 52% of the U.S. highway congestion in urban areas is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, low-cost and efficient highway incident detection and warning systems. Several solutions have been proposed but none could meet the requirements of transportation authorities. Central Signal, funded by federal agencies, has done ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government