You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. DIRECTED GAMMA RADIATION BEAM

    SBC: Applied Research Associates, Inc.            Topic: N/A

    A FEASIBILITY STUDY IS PROPOSED ON A NOVEL CONCEPT FOR A GENERATION OF A VERY LIGHTWEIGHT, HIGHLY FOCUSED GAMMA RADIATION BEAM USEFUL FOR MULTIPLE APPLICATIONS IN DEFENSE SUCH AS KILL OF ELECTRONIC SYSTEMS IN LAND WARFARE, AND (AS DESCRIBED HEREIN) DISCRIMINATION OF TARGETS IN SPACE. THE DEVICE IS SMALL ENOUGH TO "PIGGY BACK" ON THE PROPOSED REENTRY VEHICLE (RV) INTERCEPTOR MISSILES, OR BE CARRIED ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  4. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF GEOLOGY ON EXPLOSIVE SOURCE YIELD DETERMINATION

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  5. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF SITE LAYERING AND BURST DEPTH ON RADIATED SEISMIC ENERGY

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  6. DECOUPLED PENETRATION ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  7. PHASED ARRAY TELESCOPE IMAGE PROCESSING

    SBC: A-TECH CORPORATION            Topic: N/A

    AN ANALYTIC MODEL OF A WIDE FIELD, PHASED ARRAY IMAGING SYSTEM WILL BE DEVELOPED. THE MODEL IS BASED ON A MEASUREMENT SYSTEM CAPABLE OF ERROR MEASUREMENT DIRECTLY WITH RESPECT TO THE FINAL IMAGE PLANE. THE BEAMS FROM INDIVIDUAL SUBAPERTURES WILL BE COMPACTED AND CONFORMALLY MAPPED TO A DEMAGNIFIED PUPIL. WE WILL DEVELOP NONREDUNDANT, CODED APERTURE MASKS TO BE INSERTED AT THIS COMPACT PUPIL WHICH ...

    SBIR Phase I 1990 Department of DefenseAir Force
  8. HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES

    SBC: Cryopower Associates, Inc.            Topic: N/A

    THE APPLICATION OF HIGH TEMPERATURE SUPERCONDUCTORS IS SEVERELY LIMITED BY THE LOW CURRENT DENSITIES ACHIEVABLE IN BULK MATERIALS, SUCH AS Y1BA2CU3O(7-X), OR 123 FOR SHORT. THE LARGE CURRENT DENSITIES OBSERVED WITHIN INDIVIDUAL GRAINS (AND IN THIN FILMS) ARE REDUCED BY "WEAK LINKS" AT THE GRAIN BOUNDARIES, CAUSED BY MISALIGNMENT OF THE ANISOTROPIC GRAINS AND BY INSULATING IMPURITY PHASES. SOME OF ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  9. RADIATION HARDENED ROBOT POSITIONER FOR TEST SAMPLES IN PROTON EXPERIMENTS

    SBC: Design Engineering Inc            Topic: N/A

    A ROBOTIC POSITIONER WILL BE DEVELOPED FOR HANDLING AND CHANGING DEVICES TO BE TESTED (DUTS) IN HAZARDOUS RADIATION ENVIRONMENTS SUCH AS THAT FOUND INSIDE THE TEST CELL OF THE BROOKHAVEN NATION LABORATORY PROTON ACCELERATOR. PRESENTLY, PERSONNEL SAFETY INDICATES A LONG "COOLING" TIME BEFORE TEST FIXTURES CAN BE ACCESSED. THIS RESULTS IN LOWERED FACILITY USEFULNESS, INCREASED REAL FACILITY COSTS AN ...

    SBIR Phase I 1990 Department of DefenseNavy
  10. DYNAMIC STALL CONTROL

    SBC: Ecodynamics Research Associate            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government