You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. FUSION OF DEUTERIUM AND LITHIUM NUCLEI IN A PALLADIUM LATTICE

    SBC: A & D Assoc.            Topic: N/A

    THE CLAIM OF FLEISCHMANN AND PONS TO HAVE ACHIEVED "COLD FUSION" IN A PALLADIUM CRYSTAL LATTICE SATURATED WITH LITHIUM HYDRIDE (DEUTERIDE) HAS STIMULATED MUCH DISCUSSION. ALTHOUGH THEY HAVE AN UNEXPLAINED ENERGY SOURCE, THERE EXIST NO SATISFACTORY FUSION MODELS THAT CAN ACCOUNT FOR THEIR OBSERVATIONS. WE PROPOSE TO STUDY THE QUANTUM AND STATISTICAL MECHANICS OF VARIOUS MECHANISMS FOR NUCLEAR FUSIO ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. FOVEAL MACHINE VISION SYSTEMS

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    MILITARY APPLICATIONS OF COMPUTER VISION SYSTEMS REQUIRE ORDERS OF MAGNITUDE IMPROVEMENT IN CAPACITY AND SPEED OVER CURRENT SYSTEM PERFORMANCE. THE PRINCIPLE OBSTACLES TO HIGHER PERFORMANCE ARE: THE LARGE AMOUNTS OF IMAGE DATA TO BE PROCESSED; IMAGERS UNOPTIMIZED FOR THE VISION TASKS (TARGET DETECTION, CLASSIFICATION, RECOGNITION, IDENTIFICATION AND TRACKING); AND OPEN-LOOP SYSTEM ARCHITECTURE. IN ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  4. TESTING OF SHIPBOARD EW EQUIPMENT

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    AN ELECTRONIC WARFARE VERIFICATION TEST SET (EWVTS) IS DESCRIBED WHICH CAN BE USED TO QUICKLY AND RELIABLY VERIFY THE OPERATION OF SHIPBOARD ECM AND ESM SYSTEMS. THE EWVTS IS COMPRISED OF THE FOLLOWING MAJOR ELEMENTS: (A) SIGNAL GENERATION SUBSYSTEM, (B) HIGH POWER AMPLIFIER, (C) ANTENNA WITH PEDESTAL AND FEED, (D) SIGNAL MEASUREMENT SYSTEM, (E) CONTROL, AND (F) CALIBRATION SYSTEM. THE EWVTS WILL ...

    SBIR Phase I 1990 Department of DefenseNavy
  5. MULTISPECTRUM GUIDANCE TARGET GENERATOR (MSGTG)

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    A MULTISPECTRUM GUIDANCE TARGET GENERATION (MSGTG) SYSTEM IS PROPOSED WHICH WILL PROVIDE DYNAMIC, HIGH FIDELITY STIMULUS TO DUAL MODE SEEKERS. THE MSGTG WILL SUPPORT DEVELOPMENT OF SEEKER SYSTEMS COMPRISED OF AN ACTIVE RF SUBSYSTEM AND A TWO SPECTRUM INFRARED SUBSYSTEM. THE MSGTG WILL PROVIDE MULTISPECTRAL STIMULUS REPRESENTING MISSILE ENGAGEMENTS INVOLVING 1-ON-1, OR 1-ON-MANY, WITH COMPLETE FREE ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. MULTISPECTRAL TARGET GENERATOR

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    THE MULTISPECTRAL TARGET GENERATION SYSTEM (MSTG) IS PROPOSED WHICH WILL PROVIDE DYNAMIC, HIGH-FIDELITY STIMULUS TO DUAL MODE SEEKERS. THE MSTG WILL SUPPORT TEST AND EVALUATION OF ANTI-AIR MISSILE SYSTEMS WHICH EMPLOY ACTIVE RF AND TWO SPECTRUM IR SEEKER SYSTEMS. THE MSTG WILL PROVIDE MULTISPECTRAL STIMULUS REPRESENTING MISSILE ENGAGEMENTS INVOLVING 1-ON-1, OR 1-ON-MANY, WITH COMPLETE FREEDOM OF ( ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. HIGH THROUGHPUT X-PINCH SOFT X-RAY SOURCE FOR X-RAY LITHOGRAPHY

    SBC: APPLIED PULSED POWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  8. DIRECTED GAMMA RADIATION BEAM

    SBC: Applied Research Associates, Inc.            Topic: N/A

    A FEASIBILITY STUDY IS PROPOSED ON A NOVEL CONCEPT FOR A GENERATION OF A VERY LIGHTWEIGHT, HIGHLY FOCUSED GAMMA RADIATION BEAM USEFUL FOR MULTIPLE APPLICATIONS IN DEFENSE SUCH AS KILL OF ELECTRONIC SYSTEMS IN LAND WARFARE, AND (AS DESCRIBED HEREIN) DISCRIMINATION OF TARGETS IN SPACE. THE DEVICE IS SMALL ENOUGH TO "PIGGY BACK" ON THE PROPOSED REENTRY VEHICLE (RV) INTERCEPTOR MISSILES, OR BE CARRIED ...

    SBIR Phase I 1990 Department of DefenseArmy
  9. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  10. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF GEOLOGY ON EXPLOSIVE SOURCE YIELD DETERMINATION

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government