Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/spec Inc            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  3. STUDY AND EVALUATION OF FIBER REINFORCED DOWELL BARS FOR USEIN HIGHWAYS

    SBC: Etc Engineers Inc.            Topic: N/A

    DOWEL BARS HAVE TRADITIONALLY BEEN USED AS AN IMPORTANT LOADTRANSFER MECHANISM ON OUR FEDERAL HIGHWAYS. A SIGNIFICANT PROBLEM OCCURRS WITH THE USE OF THESE BARS DUE TO RUST AND RESULTANT SPALLING AND CRACKING CONCRETE. COMPOSITE REINFORCING BARS (CRB) HAVE BECOME WIDELY USED FOR CRACK CONTROL IN MANY REINFORCED CONCRETE STRUCTURES EXPOSED TO AGGRESSIVE ENVIRONMENTS. A LIMITED AMOUNT OF DATA IS AVA ...

    SBIR Phase II 1990 Department of Transportation
  4. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  5. DIRECTED GAMMA RADIATION BEAM

    SBC: Applied Research Associates, Inc.            Topic: N/A

    A FEASIBILITY STUDY IS PROPOSED ON A NOVEL CONCEPT FOR A GENERATION OF A VERY LIGHTWEIGHT, HIGHLY FOCUSED GAMMA RADIATION BEAM USEFUL FOR MULTIPLE APPLICATIONS IN DEFENSE SUCH AS KILL OF ELECTRONIC SYSTEMS IN LAND WARFARE, AND (AS DESCRIBED HEREIN) DISCRIMINATION OF TARGETS IN SPACE. THE DEVICE IS SMALL ENOUGH TO "PIGGY BACK" ON THE PROPOSED REENTRY VEHICLE (RV) INTERCEPTOR MISSILES, OR BE CARRIED ...

    SBIR Phase I 1990 Department of DefenseArmy
  6. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF GEOLOGY ON EXPLOSIVE SOURCE YIELD DETERMINATION

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  8. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF SITE LAYERING AND BURST DEPTH ON RADIATED SEISMIC ENERGY

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  9. DECOUPLED PENETRATION ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  10. HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES

    SBC: Cryopower Associates, Inc.            Topic: N/A

    THE APPLICATION OF HIGH TEMPERATURE SUPERCONDUCTORS IS SEVERELY LIMITED BY THE LOW CURRENT DENSITIES ACHIEVABLE IN BULK MATERIALS, SUCH AS Y1BA2CU3O(7-X), OR 123 FOR SHORT. THE LARGE CURRENT DENSITIES OBSERVED WITHIN INDIVIDUAL GRAINS (AND IN THIN FILMS) ARE REDUCED BY "WEAK LINKS" AT THE GRAIN BOUNDARIES, CAUSED BY MISALIGNMENT OF THE ANISOTROPIC GRAINS AND BY INSULATING IMPURITY PHASES. SOME OF ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government