You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. TWO NEW NDE TECHNIQUES FOR INSPECTION OF CONTAINMENT WELDS BENEATH COATINGS

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    INSPECTION OF PAINTED OR COATED CARBON STEEL SURFACES OFTEN INVOLVES THE REMOVAL OF THE COATING PRIOR TO INSPECTION, ESPECIALLY WHEN THE USE OF MAGNETIC PARTICLE TESTING (MT) IS REQUIRED. IN THE CASE OF EXAMINATION OF CONTAINMENT VESSEL WALLS IN NUCLEAR POWER PLANTS, THE REMOVAL IS TIME CONSUMING, RESULTING IN INCREASED RADIATION EXPOSURE TO WORKERS. IN ADDITION, THE REMOVAL MUST BE DONE WITHOUT C ...

    SBIR Phase II 1990 Nuclear Regulatory Commission
  3. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  4. FIBEROPTIC VISION SYSTEM FOR HEAVY VEHICLES

    SBC: Triangle Research and Development Corporation            Topic: N/A

    THE PROPOSED PHASE I EFFORT WOULD EVALUATE THE FEASIBILITY OF DEVELOPING A NOVEL FIBEROPTIC VISION SYSTEM FOR LARGE MOTOR VEHICLES. A NEW, BETTER MEANS OF SIDE AND REAR VISIONIS NEEDED FOR HEAVY TRUCKS AND BUSES. THE DRIVERS OF THESE VEHICLES HAVE DIFFICULTY SEEING OTHER VEHICLES IN TRAFFIC LANES TO THEIR IMMEDIATE RIGHT. WHEN THE CAB AND TRAILER OFTHE HEAVY TRUCK ARE AT AN ANGLED POSITION OR A HE ...

    SBIR Phase II 1990 Department of Transportation
  5. FACIAL LACERATION MEASUREMENT MASK FOR ANTHROPOMORPHIC MODELS

    SBC: Triangle Research and Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  6. STUDY AND EVALUATION OF FIBER REINFORCED DOWELL BARS FOR USEIN HIGHWAYS

    SBC: Etc Engineers Inc.            Topic: N/A

    DOWEL BARS HAVE TRADITIONALLY BEEN USED AS AN IMPORTANT LOADTRANSFER MECHANISM ON OUR FEDERAL HIGHWAYS. A SIGNIFICANT PROBLEM OCCURRS WITH THE USE OF THESE BARS DUE TO RUST AND RESULTANT SPALLING AND CRACKING CONCRETE. COMPOSITE REINFORCING BARS (CRB) HAVE BECOME WIDELY USED FOR CRACK CONTROL IN MANY REINFORCED CONCRETE STRUCTURES EXPOSED TO AGGRESSIVE ENVIRONMENTS. A LIMITED AMOUNT OF DATA IS AVA ...

    SBIR Phase II 1990 Department of Transportation
  7. NONDESTRUCTIVE TEST METHODS FOR ACCIDENT DAMAGE INSULATED TANK CARS

    SBC: Failure Analysis Associates            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Transportation
  8. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  9. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Transportation
US Flag An Official Website of the United States Government