You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STUDY AND EVALUATION OF FIBER REINFORCED DOWELL BARS FOR USEIN HIGHWAYS

    SBC: Etc Engineers Inc.            Topic: N/A

    DOWEL BARS HAVE TRADITIONALLY BEEN USED AS AN IMPORTANT LOADTRANSFER MECHANISM ON OUR FEDERAL HIGHWAYS. A SIGNIFICANT PROBLEM OCCURRS WITH THE USE OF THESE BARS DUE TO RUST AND RESULTANT SPALLING AND CRACKING CONCRETE. COMPOSITE REINFORCING BARS (CRB) HAVE BECOME WIDELY USED FOR CRACK CONTROL IN MANY REINFORCED CONCRETE STRUCTURES EXPOSED TO AGGRESSIVE ENVIRONMENTS. A LIMITED AMOUNT OF DATA IS AVA ...

    SBIR Phase II 1990 Department of Transportation
  2. DEVELOPMENT OF A PROTOTYPE REMOTE LONGITUDINAL STRESS MONITORING DEVICE

    SBC: Salient Systems Inc.            Topic: N/A

    A LOW COST MEASUREMENT MODULE TAILORED TO THE APPLICATION OFSENSING RAIL LONGITUDINAL STRESS AND TEMPERATURE IS TO BE DEVELOPED AND INSTALLED IN TWO EXISTING TEST SITES. RESEARCH INTO THE BEST METHOD OF GENERATING POWER AND COMMUNICATING TO THE OUTSIDE WORLD WITHOUT HARD-WIRED CONNECTIONS IS TO BE DETERMINED. A PROTOTYPE OF THE NON-HARD-WIRED CONFIGURATION IS EXPECTED TO BE BUILT AND INSTALLED.

    SBIR Phase II 1990 Department of Transportation
US Flag An Official Website of the United States Government