You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Power Generation for Small Unmanned Vehicles

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: OSD08UM5

    This program will integrate a lightweight, high efficiency alternator with a quiet, fuel efficient and high power density heavy fuel engine. The electrical power source uses a proprietary, compact and very high power-to-weight alternator using rare earth permanent magnets. It is scalable from 0.5 to 70 kW and larger. MAI''s alternator will be integrated with Engine Research Associates (ERA) Mig ...

    SBIR Phase II 2009 Department of DefenseOffice of the Secretary of Defense
  2. Cost Effective, Power Efficient, Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More than 52% of U.S. urban highway congestion is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, cost-effective and efficient highway incident detection and warning systems. Several solutions have been proposed but none could satisfy requirements of transportation authorities. Central Signal's research and development, grounded in mor ...

    SBIR Phase II 2009 Department of Transportation
  3. Design, Development and Testing of Optimized "Soft Crack Arrestors"

    SBC: Engineering Mechanics Corporation of Columbus            Topic: 07PH1

    EMC2''s Phase II proposal focuses on continuing development of "Soft Crack Arrestors" through additional key material property, detailed analytical refinement of the design, and full-scale pipe validation testing. This material testing will be done over a range of temperatures to cover extreme conditions for future pipeline designs, with special attention to arctic applications. It is also essen ...

    SBIR Phase II 2009 Department of Transportation
  4. Dynamic Non-contact 3D Measurement System for Rollover Testing

    SBC: PHOTON-X, INC.            Topic: 07NH2

    Photon-X is proposing to develop a 3D roof imaging system to monitor vehicle roof deformation during vehicle rollover testing. The system will provide photographic resolution imagery with the ability to track the dot pattern on the vehicle roof. The Photon-X spatial phase 3D imaging system will provide an accurate visible record of roof deformation with position accuracy of 1mm and velocity accu ...

    SBIR Phase II 2009 Department of Transportation
  5. Environmental Pavement Monitor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of asphalt and concrete pavement so that timely maintenance can maximize their usefulness. This SBIR will develop a sensor that can be embedded within concrete or asphalt, which can measure moisture, temperature, stress and strain. It will provide critical data for evaluating pavement performance starting with th ...

    SBIR Phase II 2009 Department of Transportation
  6. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  7. A Higher Performance Traffic Detector Built on SmartSensor HD and Multi-Beam Radar Technology

    SBC: WAVETRONIX LLC            Topic: 091FH3

    Wavetronix currently sells the SmartSensor HD radar detection which is the highest performance above ground detector currently available. However, the count, speed and classification accuracy can be significantlly improved by employing multi-beam radar technology which we have recently developed. Multi-beam radar technology allows multiple radars to be used cost effectively inside a single senso ...

    SBIR Phase I 2009 Department of Transportation
  8. A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner

    SBC: Migma Systems Inc.            Topic: 091FH4

    Automated vehicle counting technology has been in use for many years, but developments in automated pedestrian counting technology have been limited. Pedestrians are more difficult to detect, track and count, than motor vehicles because their paths are much less constrained. In Phae I, we propose to develop a new system for pedestrian detection, tracking and counting. In this system, both IR LE ...

    SBIR Phase I 2009 Department of Transportation
  9. Device and Strategy for Shock Wave Mitigation

    SBC: LARRY HILL CONSULTING, INC.            Topic: 091FH1

    Substantial simulation work has been done showing that traffic shock-waves can be reduced or eliminated through "cooperative adaptive cruise control" and "communicating cruise control" where following vehicles are warned that leading vehicles are slowing in time to react. To be effective, however, such devices must be installed and operate in the majority of vehicles in the queue. Even if mandat ...

    SBIR Phase I 2009 Department of Transportation
  10. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government