You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Safe Track Protection and Advance Warning System

    SBC: WAVETRONIX LLC            Topic: 082FH1

    To improve safety and efficiency on high-speed signalized intersections a dilemma zone protection system has been designed to automatically configure site-specific protection boundaries on both main-street approaches by continously tracking vehicles within up to 1000 feet of each stop line. The system will further customize and refine protection by continously estimating the probability of a seve ...

    SBIR Phase I 2009 Department of Transportation
  2. A Higher Performance Traffic Detector Built on SmartSensor HD and Multi-Beam Radar Technology

    SBC: WAVETRONIX LLC            Topic: 091FH3

    Wavetronix currently sells the SmartSensor HD radar detection which is the highest performance above ground detector currently available. However, the count, speed and classification accuracy can be significantlly improved by employing multi-beam radar technology which we have recently developed. Multi-beam radar technology allows multiple radars to be used cost effectively inside a single senso ...

    SBIR Phase I 2009 Department of Transportation
  3. Interactive Multimedia to Teach Reading to Adult Learners

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  4. GRAPHICS ACCESS SENSORY SYSTEM (GASS)

    SBC: Automated Functions, Inc.            Topic: N/A

    THE GRAPHIC ACCESS SENSORY SYSTEM (GASS) WILL ENABLE A VISUALLY IMPAIRED PERSON TO GAIN ACCESS TO GRAPHIC SCREENS ON THE IBM PC, IBM AT, IBM PS/2, AND COMPATIBLES. IT WILL CONVERT THE GRAPHICAL SCREEN DATA INTO REGULAR TEXT CHARACTERS. IN THIS WAY, EXISTING ADAPTIVE AIDS MAY BE USEDTO OUTPUT THE TEXT IN SYNTHETIC SPEECH OR BRAILLE. CURRENTLY THERE IS NO TECHNOLOGY THAT PROVIDES ACCESS TO GRAPHIC S ...

    SBIR Phase I 1990 Department of Education
  5. Intelligent Graphic Access Manager

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  6. PORTABLE ADAPTIVE READING MACHINE (PARM)

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Education
  7. New Braille Technology (NBT)

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  8. WorkWORLD On-Line: An Employment Decision Tool

    SBC: Decision Technology Network,            Topic: N/A

    Researchers at Virginia Commonwealth University have developed decision support software, called WorkWORLD, for analyzing the financial effects of current and alternative "work incentive" policies on individuals who receive various disability and welfare benefits. Decision Technology Network (DTN), Inc. proposes: (1) to further develop WorkWORLK as an individual counseling and decision-making too ...

    SBIR Phase I 1996 Department of Education
  9. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...

    SBIR Phase I 2009 Department of Transportation
  10. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government