You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated Target Assessment Development Environment

    SBC: ABTECH CORPORATION            Topic: N/A

    Automated processing of sensor/signal data and other non-sensor information provides substantial force-multiplying benefits. The timely and cost-effective leveraging of these types of information provides a significant advantage over adversaries not possessing comparable information processing capabilities. The intelligent processing of diverse types of data provides a target assessment technology ...

    SBIR Phase II 1996 Department of DefenseDefense Advanced Research Projects Agency
  2. Aim Telemetry Expert Analyst & Monitor

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  3. GIS Function Coupling for Virtual Globes

    SBC: WxAnalyst Ltd, Inc.            Topic: N/A

    Virtual Globe (VG) systems such as Google Earth, NASA World Winds and Microsoft Virtual Earth provide captivating animated 3D visualizations and support user queries for information at a point. NASA MSFC's VG-based Real Time Mission Monitor (RTMM) enhances management and tracking of field experiment missions. The National Weather Service's RIDGE service uses VG to disseminate radar and support dec ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  4. Video Retrieval Based on Language and Image Analysis

    SBC: Advance, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  5. Safe Track Protection and Advance Warning System

    SBC: WAVETRONIX LLC            Topic: 082FH1

    To improve safety and efficiency on high-speed signalized intersections a dilemma zone protection system has been designed to automatically configure site-specific protection boundaries on both main-street approaches by continously tracking vehicles within up to 1000 feet of each stop line. The system will further customize and refine protection by continously estimating the probability of a seve ...

    SBIR Phase I 2009 Department of Transportation
  6. A Higher Performance Traffic Detector Built on SmartSensor HD and Multi-Beam Radar Technology

    SBC: WAVETRONIX LLC            Topic: 091FH3

    Wavetronix currently sells the SmartSensor HD radar detection which is the highest performance above ground detector currently available. However, the count, speed and classification accuracy can be significantlly improved by employing multi-beam radar technology which we have recently developed. Multi-beam radar technology allows multiple radars to be used cost effectively inside a single senso ...

    SBIR Phase I 2009 Department of Transportation
  7. Low-cost device relevant Indium Gallium Nitride (InGaN) or Alternatives

    SBC: 4WAVE, INC.            Topic: SB082053

    The project aims to grow device-quality InxGa1-xN, an important semiconductor because the band gap can be shifted widely by varying x, using a new form of plasma sputtering, Biased-Target Deposition (BTD). The major objectives are to grow x > 0.05 material on sapphire at 600-800°C (standard) and 300-500°C (beneficially reduced) temperatures, and to characterize material quality via X-ray diffra ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  8. A Unified Network Security Architecture for Large, Distributed Networks

    SBC: Zron Networks, Inc.            Topic: N/A

    In typical, multi-organizational networking environments, it is difficult to define and maintain a uniform authentication scheme that provides users with easy access to required information while maintaining the security and integrity of the underlying information. This proposal offers a unique and innovative architecture for doing so through the utilization of a Proxy Service Listener (PSL) and ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  9. SOFT HUB FOR BEARINGLESS ROTORS

    SBC: Advanced Technologies, Inc            Topic: N/A

    THE ROTARY WING INDUSTRY HAS STRIVED TO DEVELOP A BEARINGLESS MAIN ROTOR (BMR), HAVING NO MECHANICAL BEARINGS. ALL TRUE BMR SYSTEMS ARE LIMITED BY THE STRENGTH IN STATIC-FATIGUE LOADS VERSUS FLAPWISE FLEXIBILITY, RESULTING IN LIMITED "G" MANEUVERS FROM A HIGHLY RESPONSIVE ROTOR SYSTEM. ATI'S SOFT HUB ROTOR CONCEPT ALLOWS TILTING OF THE ROTOR DISC MOVING THE VIRTUAL HINGE INBOARD ELIMINATING THIS U ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  10. A Fast-Response Atmospheric Turbulence (FRAT) Probe with Gas-Sampling Ducts

    SBC: AEROPROBE CORPORATION            Topic: S108

    The objective of this proposal is to design, construct and test a high-frequency-response air-data probe, the Fast Response Atmospheric Turbulence probe (FRAT probe) that will be able to operate in harsh and humid atmospheric environments. Both requirements, high-frequency response and resistance to water spray can be accommodated by mounting the pressure sensors flush with the probe surface. We w ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government