You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW ELEVATION SENSITIVE GPS ANTENNA WITH MULTIPATH SUPPRESSION

    SBC: Adroit Systems, Inc.            Topic: N/A

    ADROIT SYSTEMS, INC. PROPOSES TO DESIGN A NEW ANTENNA FOR A DIFFERENTIAL GPS (DGPS) BASE RECEIVER IN PHASE I, AND TO PROTOTYPE AND TEST THIS ANTENNA IN PHASE II. THIS NEW ANTENNA WILL INCORPORATE OPTIMUM LOW ELEVATION GAIN AND MULTIPATH SUPPRESSION TO ALLOW THE TRACKING OF SATELLITES AT ELEVATIONS FROM THE HORIZON TO FIVE DEGREES. AT ALL ELEVATIONS, THE ANTENNA WILL MINIMIZE ERRORS DUE TO MULTIPAT ...

    SBIR Phase I 1991 Department of Transportation
  2. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  3. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  4. SIMPLIFIED AUTO CRASH MEASURING USING A PORTABLE INTEGRATED LASER RADAR/CAMCORDER

    SBC: Coleman Research Corp.            Topic: N/A

    DIGITAL SIGNAL CORPORATION PROPOSES TO REPLACE THE CURRENT VEHICLE CRUSH MEASUREMENT SYSTEM OF HIGHLY TRAINED INVESTIGATORS USING TIME CONSUMING METHODS WITH A PORTABLE, RUGGED, EASY TO USE LASER RADAR/CAMCORDER SYSTEM. THE BENEFITS RANGE FROM EASY TO REPRODUCE AND CORROBORABLE RESULTS TO AN INCREASE IN PRODUCTIVITY POSSIBLE WITH A TRIPOD MOUNTED SYSTEM WHICH SETS UP AND TAKES DATA WITHIN MINUTES. ...

    SBIR Phase I 1991 Department of Transportation
  5. IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE

    SBC: GINER INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  6. SHIP MOTION DETERMINATION SYSTEM AT PIERSIDE

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    A DEMONSTRATION MOORED-SHIP MOTION DETERMINATION (MSMD) SYSTEM WILL BE BUILT AND TESTED. THE MSMD SYSTEM TRACKS CONTAINER CARGO SHIPS AT PIERSIDE, USING A PIER-MOUNTED SENSOR SUITE. AN EXTENDED KALMAN FILTER CONVERTS THE SENSORREADINGS INTO A PREDICTION OF THE POSITION, ORIENTATION AND MOTION OF THE SHIP, IN ALL SIX DEGREES OF FREEDOM. THE CONFIGURATION OF SENSORS FOR THE MSMD SYSTEM AND THE MATHE ...

    SBIR Phase I 1991 Department of Transportation
  7. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...

    SBIR Phase I 2009 Department of Transportation
  8. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  9. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  10. ADVANCED FARE PAYMENT MEDIA

    SBC: Glh Inc            Topic: N/A

    THE SBIR PROGRAM SOLICITATION PROVIDES AN OPPORTUNITY TO DESIGN AND DEVELOP A FARE PAYMENT SYSTEM BASED ON ADVANCED FARE PAYMENT MEDIA TO MEET THE NEEDS OF TRANSIT PATRONS AND SYSTEMS IN THE 1990S. THE SOLICITATION STATED THE NEW MEDIASHOULD: BE COST EFFECTIVE, PERMIT PAYMENT OF ZONAL FARES, INCREASE FLEXIBILITY IN PAYMENT SCHEDULES AND METHODS, AND IMPROVE REVENUE SECURITY AND PROCESSING CAPABILI ...

    SBIR Phase I 1991 Department of Transportation
US Flag An Official Website of the United States Government