Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS

    SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY            Topic: N/A

    ACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. ICING PREVENTION BY NUCLEATION OF ICE PARTICLES IN FRONT OF SUBSONIC AIRCRAFT

    SBC: Aerodyne Research, Inc.            Topic: N/A

    WE PROPOSE THE INVESTIGATION OF NUCLEATION PROCESSES CAPABLEOF CAUSING THE FREEZING OF SUPERCOOLED WATER DROPLETS IN FRONT OF A MOVING SUBSONIC AIRCRAFT. THE GOAL IS TO DEVELOPA NUCLEATION MECHANISM CAPABLE OF FREEZING THE WATER DROPLETS FAR ENOUGH IN FRONT OF THE MOVING PLANE SO THAT BY THE TIME THE PLANE REACHES THE DROPLETS THEY ARE FROZEN AND BOUNCE FROM THE LEADING EDGES AND THE IMPENAGE, WIT ...

    SBIR Phase I 1990 Department of Transportation
  9. "MAGLEV OPTICAL DETECTION OF OBSTACLES (MODO)"

    SBC: Aspen Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  10. IN SITU INFARED FIBER OPTIC SENSOR FOR NDI CORROSION AND DISBOND DETECTION IN AIRCRAFT JOINTS/FASTENERS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    FOSTER-MILLER PROPOSES TO DEVELOP A NOVEL INFARED FIBER OPTIC SENSOR TO NON-DESTRUCTIVELY DETECT CORROSIVE ATTACK AND DISBONDING A BOTH METAL-TO-METAL AND COMPOSITE TO METAL JOINTS AND FASTENERS IN AIRCRAFT STRUCTURES. THIS NEW INFRARED NDI SYSTEM WILL BE A POWERFUL ANALYTICAL TOOL TO DETECT THE ONSET OF DISBONDING AND INTRUSION OF CORROSIVE ELEMENTS INTO THE JOINT LONG BEFORE IT BECOMES VISIBLE B ...

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government