You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
IMPROVED AEROSOL CAN
SBC: Materials Engineering & Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation -
An Inexpensive Structural Core Material for Composite Bridges
SBC: Polymer Bridge Systems, Inc. Topic: N/APolymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...
SBIR Phase I 1996 Department of Transportation -
AIRCRAFT SAFTEY
SBC: SYSTEMS & ELECTRONICS, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation