You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...

    SBIR Phase I 2009 Department of Transportation
  2. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  3. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  4. Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies

    SBC: Planphoria LLC            Topic: 091FH5

    Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use. Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by leading ...

    SBIR Phase I 2009 Department of Transportation
  5. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  6. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  7. Software for In-Flight Detection of Widespread Fatigue in Engine Disks

    SBC: Monitoring Technology Corp            Topic: N/A

    The proposed project will demonstrate unique digital signal processing software for automated, early detection of Widespread Fatigue (WF) damage in turbine engine disks. The software, known as RVMD is based on recently patented technology in Rotational Vibrationa Monitoring (RVM). RVMD will measure loss of disk structural rigidity due to WF defects, both from High Cycle and Low Cycle Fatigue. ...

    SBIR Phase I 1996 Department of Transportation
  8. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  9. Neutron Radiography with Inorganic Scintillation Detectors

    SBC: World Physics Technologies, Inc.            Topic: N/A

    We propose here to evaluate a variety of inorganic scintillators, including sodium iodide and bismuth germanate, for use in energy-sensitive neutron detectors. We will couple these crystals to photomultiplier tubes and measure the prompt response to inelastic neutron reactions with the scintillator atoms. To unfold the incident neutron energy distribution from the resulting signal pulse heights, ...

    SBIR Phase I 1996 Department of Transportation
  10. Portable Active Thermographic Coating Inspection System

    SBC: Fuchs Consulting Inc            Topic: 091FH2

    This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government