You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  2. Advanced Signal Processing for Non-Literal Exploitation of Spectral Imagery

    SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC.            Topic: NGA04001

    To maximize the utility of spectral imagery sensors it is essential that processing techniques for data from these sensors are highly automated, provide high probability of target detection with low false alarm rates, and offer a reliable confidence assessment capability. The detection and false alarm probabilities required for a hyperspectral sensor to be a useful intelligence asset varies based ...

    SBIR Phase I 2004 Department of DefenseNational Geospatial-Intelligence Agency
  3. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  4. Passive multi-view, multi-channel detection of highly obscured targets

    SBC: Arete Associates            Topic: NGA04001

    The goal of this Phase I SBIR is to define a set of algorithms that will detect and characterize static man-made objects highly obscured by foliage within multi-view, multi-channel optical data collected passively from UAVs or other aerial platforms. The proposed algorithm stream will be constructed so as to comprehend and mitigate real-world interfering effects such as clouds, smoke and haze. Dur ...

    SBIR Phase I 2004 Department of DefenseNational Geospatial-Intelligence Agency
  5. SAR Tomography for Target/Feature Detection in Foliated Regions

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: NIMA03002

    Tomographic SAR is a data collection and processing technology that produces true 3-D volumetric imagery. This approach offers significant benefits for enhanced imagery through clutter rejection, enhanced target definition, and better resolution. Tomographic SAR has been demonstrated at UHF frequencies where it has shown benefits in concealed target detection, improved feature extraction and cha ...

    SBIR Phase II 2004 Department of DefenseNational Geospatial-Intelligence Agency
  6. Effective, Low Cost Ethanol Sensor System for Repeat DWI Vehicles, with Wireless "Police Alert" Features

    SBC: GINER INC            Topic: N/A

    Alcohol related crashes are a serious public health issue, resulting in an estimated 17,400 deaths and 292,000 injuries in 2003. Giner, Inc. proposes to combine innovative ethanol sensors, sampling techniques and wireless capabilities to provide a novel, inexpensive and convenient law enforcement tool for detecting alcohol use in the vehicles of repeat DWI offenders. The proposed sensor system h ...

    SBIR Phase I 2004 Department of Transportation
  7. Remote sensing system to improve the safet/security, efficiency and effectiveness of Bus Rapid Transit using mini-unmanned aerial vehicles

    SBC: Harman Consulting, LLC            Topic: N/A

    The leading edge of ITS technology is the application of geo-spatial technologies to improve the efficiency, effectiveness, safety and security of transit. Firt came the application of global positioning systems integrated into geographic information systems. Lastly, remotely sensed imagery from high-resolution digital sensors on satellites, and real-time video from mini-unmanned aerial vehicles ...

    SBIR Phase I 2004 Department of Transportation
  8. Guided Shear Horizontal Wave Electromagnetic Acoustic Transducer for In-line Nondestructive Inspection of Pipeline

    SBC: Intelligent Automation, Inc.            Topic: N/A

    Pipelines used for transporting natural gas and petroleum fluid are aging and may suffer from accidental damage. The need is growing for an efficient and reliable inspection system to locate and characterize the weak spots that can fail and result in leakage. Magnetic fulx leakage in-line inspection smart Pip-Inspection-Gears and compression wave ultrasonic transmission devices, currently used f ...

    SBIR Phase I 2004 Department of Transportation
  9. A New Robust Multiple Pedestrians Detection and Tracking System

    SBC: Migma Systems Inc.            Topic: N/A

    As part of DOT's Intelligent Vehicle Intiative program, the FHWA is developing advanced vehicle safety and driver information systems. Vision-based pedestrian detection in outdoor scenes remains an open challenge. People dress in very different colors that sometimes blend with the background. They wear hats or carry bags, and stand, walk and change direction unpredictably. The background is variou ...

    SBIR Phase I 2004 Department of Transportation
  10. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
US Flag An Official Website of the United States Government