You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Small Scale Diesel Generator for Railway Applications
SBC: MAINSTREAM ENGINEERING CORP Topic: 122FR1Autonomous inspection systems are necessary to increase awareness of track safety and maintenance issues. However, electrical power for these systems is not available under freight railway vehicles. Mainstream Engineering (MEC) proposes development of a small-scale diesel generator with an integrated starter-alternator (ISA) and automated battery charging circuit for this application. The proposed ...
SBIR Phase I 2013 Department of Transportation -
Demonstration of a Low-Cost Vehicle Monitoring
SBC: MAINSTREAM ENGINEERING CORP Topic: 112FM1During the Phase I SBIR Effort, Mainstream demonstrated a unique vehicle monitoring system (VMS) for tractor trailer applications. The development was driven by the need to easily store, retrieve, and transfer key trailer parameters to the tractor and the need to electronically transfer key driver, tractor, and trailer information to roadside inspectors and maintenance personnel. In Phase I, we ...
SBIR Phase II 2013 Department of Transportation