You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Effective and Efficient GIS Use in Transportation Planning Using an Integrated Vector and Raster System and Pseudo English as a Programming Language

    SBC: Susquehanna Resources And            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  2. TIED-BACK ELEMENT & SOIL NAILING WALL

    SBC: Schnabel Foundation Company            Topic: N/A

    THIS PROPOSAL CONCERNS THE DEVELOPMENT OF AN INNOVATIVE EARTH RETENTION SYSTEM. SPECIFICALLY, IT RELATES TO COMBINING PERMANENTLY TIED-BACK ELEMENTS WITH SOIL NAILING TO ENABLE THE CONSTRUCTION OF A RETAINING WALL IN SOILS AND SOFT ROCKS. THIS EARTH RETENTION SYSTEM IS BUILT FROM THE TOP DOWN AS THE EXCAVATION PROCEEDS AND CAN BE USED FOR A PERMANENT OR TEMPORARY WALL, OR TO STABLIZE LANDSLIDES.

    SBIR Phase II 1984 Department of Transportation
  3. Dynamic Intrusion Sensing System Using a High Speed Low Cost 3D Camera

    SBC: Robotronics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  5. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  6. Feasibility of and Techniques for CORSIM Model Computer-Based Training

    SBC: Pacific Animated Imaging            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  7. Three Dimensional Coordinate Measurement System- For Driver Hand Position Monitoring

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    While the applications of a three dimensional coordinate measurement system are diverse, such a system will be particularly useful in reporting driver hand position and head movement coordinates. The coordinate information is used to evaluate driver behavior and performance in the new generation of instrumented vehicles where the driver engages in manipulation of specific equipment. Having devel ...

    SBIR Phase I 1996 Department of Transportation
  8. MULTI-MODE TRANSIT ACCOUNTING".

    SBC: Paperless Acct. Trans. Tech            Topic: N/A

    FEASIBILITY OF USING MICROPROCESSOR BASED PERSONAL TOKEN DEVICES INDUCTIVELY COUPLED FOR BI-DIRECTIONAL INFORMATION FLOW WILL BE STUDIED FOR TRANSIT FARE COLLECTION AND ACCOUNTING. A SIMPLE MICROPROCESSOR BASED USER TOKEN WILL BE DEVELOPED PRINCIPALLY TO TEST COUPLING AND SOFTWARE CONCEPTS. HARDWARE AND SOFTWARE INTERFACES TO EXISTING TURNSTILE EQUIPMENT WILL BE STUDIED. RESEARCH ON APPROPRIATE RE ...

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government