You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A LaF3:Nd + Photosensitive Wire Chamber for Gamma-Ray Imaging

    SBC: Applied Physics Technologies            Topic: N/A

    40089 Applied Physics Technologies Corporation Improvements over existing scintillators, in light output, gamma ray detection efficiency, and fast decay times for their scintillation light, has been of interest to the nuclear physics, high energy physics, nuclear medicine (especially PET) and astrophysics communities. New detector approaches for enhancing the performance and reducing the cost of ...

    SBIR Phase I 1996 Department of Energy
  2. Three Dimensional Coordinate Measurement System- For Driver Hand Position Monitoring

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    While the applications of a three dimensional coordinate measurement system are diverse, such a system will be particularly useful in reporting driver hand position and head movement coordinates. The coordinate information is used to evaluate driver behavior and performance in the new generation of instrumented vehicles where the driver engages in manipulation of specific equipment. Having devel ...

    SBIR Phase I 1996 Department of Transportation
  3. A High-Performance Data Acquistion and Processing System for Spectroscopic Applications

    SBC: InterScience, Inc.            Topic: N/A

    41017 November 19, 1996 InterScience, Inc. Diagnostics which provide high spatially and temporally resolved measurements are essential in assessing the performance of present day experiments in controlled nuclear fusion research. Several of these diagnostics rely on high-resolution spectrometers to measure the spectral characteristics of the plasma light ...

    SBIR Phase I 1996 Department of Energy
  4. A Real-Time Multiple Source Video Compression and Storage System

    SBC: InterScience, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  5. A High Resolution Multi-hit Time to Digital Converter Integrated Circuit

    SBC: Lecroy Corp.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  6. Natural Gas Reformer Cleanup System for Proton Exchange Membrane Fuel Cells

    SBC: Mechanical Technology, Inc.            Topic: N/A

    40969 November 19, 1996 Mechanical Technology, Inc. Proton exchange membrane fuel cells generate electricity by using relatively clean hydrogen gas as a fuel. For on-site cogeneration, however, the fuel of choice is natural gas. A natural gas reformer can convert natural gas to dirty hydrogen. This project will develop a system to clean this product ga ...

    SBIR Phase I 1996 Department of Energy
  7. An Engineered RNA/DNA Polymerase to Increase Speed and Economy of DNA Sequencing

    SBC: PROMEGA CORP.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  8. Advanced Concept Basalt Fiber Reinforcement for Concrete

    SBC: Research & Technology Corp            Topic: N/A

    Extensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...

    SBIR Phase I 1996 Department of Transportation
  9. Modelling and Analysis of Superconducting Joints for High Field and Pulsed Applications in ITER

    SBC: SHERBROOKE CONSULTING, INC.            Topic: N/A

    40961 November 19, 1996 Sherbrooke Consulting, Inc. Superconducting magnets for the International Thermonuclear Engineering Reactor will require several hundred electrical joints. The joints will be located in high pulsed magnetic fields which will induce losses in the conducting media of the joint and in the superconducting cable itself. These losses add ...

    SBIR Phase I 1996 Department of Energy
  10. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government