You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Fatigue Crack Detection Via Differential Thermography
SBC: Stress Photonics, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
POTATO MICROTUBER PRODUCTION IN BIOREACTORS
SBC: Small Potatoes, Inc. Topic: N/AMICROTUBER USAGE HAS BEEN LIMITED BY HIGH LABOR INPUTS NEEDED FOR PRODUCTION. USING THE PATENTED MICROTUBER MULTIPLICATION SYSTEMS (MMS), THE MULTIPLICATION FACTOR IS INCREASED OVER 25 FOLD. THE INCREASE IN MULTIPLICATION FACTOR SIGNIFICANTLY REDUCES MICROTUBER PRODUCTION COSTS. IN THIS PROPOSAL THREE DIFFERENT BIOREACTOR STYLES WILL BE EVALUATED FOR THEIR COMPATIBILITY WITH THE MMS. EACH BIOREACT ...
SBIR Phase II 1993 Department of Agriculture -
The Application of Advanced Technology to Traffic Enforcement
SBC: Anacapa Sciences, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
PHOSPHORUS REMOVAL IN AGRICULTURAL RUNOFF USING AN INTEGRATED WETLAND/CHEMICAL SYSTEM
SBC: Db Environmental Laboratory In Topic: N/AA PROPOSED INTEGRATED WETLAND-CHEMICAL TREATMENT SYSTEM HAS THE POTENTIAL TO BE AN EFFECTIVE, ECONOMICAL, AND ENVIRONMENTALLY ACCEPTABLE TECHNIQUE FOR REMOVING PHOSPHORUS FROM AGRICULTURAL WASTEWATERS. THE PROPOSED SYSTEM CONSISTS OF A SUBMERSED MACROPHYTE POND (SMP) FOR SUSPENDED SOLIDS, DISSOLVED ORGANIC CARBON AND P REMOVAL, AS WELL AS ELEVATION OF WATER COLUMN PH LEVELS. EFFLUENT FROM THE SMP ...
SBIR Phase II 1996 Department of Agriculture