You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Development of Laser Materials and Rugged Coatings as Components for Tunable Ultraviolet Laser Systems

    SBC: Lightning Optical Corp            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  2. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  3. DESIGN OF COMPONENTS FOR AN AMPERE INTENSITY, MEV ENERGY, DC ELECTRON BEAM SYSTEM

    SBC: National Electrostatics Corp.            Topic: N/A

    NATIONAL ELECTROSTATICS CORPORATION (NEC) PROPOSES TO DESIGNCRITICAL COMPONENTS, AND INVESTIGATE REQUIRED ION OPTICAL ELEMENTS FOR A 3 MEV, 2-5 AMP DC ELECTRON BEAM. SUCH A SYSTEM WOULD BE BASED ON A VERTICAL TEST PELLETRON ACCELERATOR OF THE VAN DE GRAAFF TYPE OWNED AND OPERATED BY NEC. IN THIS CONCEPT AN ELECTRON BEAM PRODUCED IN THE HIGH VOLTAGE TERMINAL OF THE PELLETRON ACCELERATOR WILL BE ACC ...

    SBIR Phase II 1984 Department of Energy
  4. The Application of Advanced Technology to Traffic Enforcement

    SBC: Anacapa Sciences            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government