You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Laser Materials and Rugged Coatings as Components for Tunable Ultraviolet Laser Systems

    SBC: Lightning Optical Corp            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  2. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  3. DESIGN OF COMPONENTS FOR AN AMPERE INTENSITY, MEV ENERGY, DC ELECTRON BEAM SYSTEM

    SBC: National Electrostatics Corp.            Topic: N/A

    NATIONAL ELECTROSTATICS CORPORATION (NEC) PROPOSES TO DESIGNCRITICAL COMPONENTS, AND INVESTIGATE REQUIRED ION OPTICAL ELEMENTS FOR A 3 MEV, 2-5 AMP DC ELECTRON BEAM. SUCH A SYSTEM WOULD BE BASED ON A VERTICAL TEST PELLETRON ACCELERATOR OF THE VAN DE GRAAFF TYPE OWNED AND OPERATED BY NEC. IN THIS CONCEPT AN ELECTRON BEAM PRODUCED IN THE HIGH VOLTAGE TERMINAL OF THE PELLETRON ACCELERATOR WILL BE ACC ...

    SBIR Phase II 1984 Department of Energy
  4. OVERHEAD INFRARED VEHICLE DETECTOR

    SBC: Schwartz Electro-Optics, Inc            Topic: N/A

    THE SHORTCOMINGS OF THE WIDELY USED BURIED-LOOP VEHICLE DE- TECTOR -- 3 TO 5 YEAR LIFETIME, COSTLY, INCONVENIENT TO MAINTAIN/REPLE, INCOMPATIBLE WITH SOME ROADWAYS, UNRELIABLE ACTIVATION BY SOME VEHICLES -- CAN BE OVERCOME THROUGH THE USE OF OVERHEAD INFRARED VEHICLE DETECTORS. THE TECHNICAL OBJECTIVES OF THE PROPOSED RESEARCH INCLUDE A SURVEY OF APPROPRIATE INFRARED SENSORS AND DEVICE ANALYSIS, D ...

    SBIR Phase II 1989 Department of Transportation
  5. The Application of Advanced Technology to Traffic Enforcement

    SBC: Anacapa Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government