You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Fatigue Crack Detection Via Differential Thermography
SBC: Stress Photonics, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER
SBC: LOCUS, INC. Topic: N/AUSCG SOLICITATION 90-CG5 SUGGESTS EVALUATION OF KALMAN FILTERING A DIGITAL SIGNAL PROCESSING (DSP) TECHNIQUE, TO IMPROVE GEODETIC POSITIONING PROVIDED BY SINGLE CHAIN, AND EVENTUALLY, MULTICHAIN LORAN RECEIVERS. A DSP TECHNIQUE COMPARABLE TO KALMAN FILTERING HAS ALREADY BEEN IMPLEMENTED ON A SINGLE CHAIN LORAN RECEIVER, RESULTING IN SUBSTANTIAL GEODETIC POSITIONING IMPROVEMENTS IN NOISY, DYNAMIC E ...
SBIR Phase II 1991 Department of Transportation -
INVESTIGATION OF STRUCTURAL ADHESIVES
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/ATHIS PROJECT IS DESIGNED TO FURNISH FHWA WITH A NUMBER OF IMPORTANT PRODUCTS IN PREPARATION FOR ACCELERATED LIFE TESTING (ALT) OF A LARGE SCALE MODEL JOINT AND A LONG TERM FULL SCALE BEAM TEST TO VERIFY THE ALT. THE MOST IMPORTANT PRODUCT IS A PROCEDURE FOR INTRODUCING DESIRED MOISTURE LEVELS INTO LARGE AREA BONDS IN A RELATIVELY SHORT TIME. A SECOND PRODUCT IS THE ALT PLAN WHICH ACCOUNTS FOR THE ...
SBIR Phase II 1991 Department of Transportation -
The Application of Advanced Technology to Traffic Enforcement
SBC: Anacapa Sciences, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation