You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated Driveway Access Management System Using a 3D Terrestrial Imagery User Interface

    SBC: SIMWRIGHT, INC.            Topic: N/A

    New developments in tools for exploitation of stereo aerial photography now enable desktop Windows applications capable of interfacing with existing GIS databases. One area of potential use for these tools is in the area of Highway Access Management especially as it relates to improvement in the process for Highway Driveways. Research is proposed to determine system requirements for using a digi ...

    SBIR Phase II 2002 Department of Transportation
  2. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  3. The Application of Advanced Technology to Traffic Enforcement

    SBC: Anacapa Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. Real Time Signal State Transition Software for ATC- NTCIP Interface

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...

    SBIR Phase II 2012 Department of Transportation
US Flag An Official Website of the United States Government