You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
Displaying 3 result(s)
-
Fatigue Crack Detection Via Differential Thermography
SBC: Stress Photonics, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
The Application of Advanced Technology to Traffic Enforcement
SBC: Anacapa Sciences Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation