You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors

    SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION            Topic: 161FH1

    Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors 12/05/2016 The overall goal of Phase II of this SBIR project is to demonstrate a working prototype of one or more tools and/or approaches that catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. Phase II will provi ...

    SBIR Phase II 2017 Department of Transportation
  2. Pedestrian and Cyclist Detection Devices for Transit Buses

    SBC: NOVATEUR RESEARCH SOLUTIONS LLC            Topic: 161FT1

    This SBIR proposal presents a robust and cost-effective pedestrian and cyclist detection and collision warning system for transit buses. It uses inexpensive but robust sensors and incorporates state-of-the-art object detection techniques to enable effective pedestrian and cyclist detection near transit buses in different environmental conditions. The proposed collision warning system exploits meas ...

    SBIR Phase II 2017 Department of Transportation
  3. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. Fish Trap Extension Kit for Lionfish Control

    SBC: R3 DIGITAL SCIENCES, INC.            Topic: 822N

    R3 Digital Sciences (R3-DS) will develop and commercialize the Fish Trap Extension Kit (FTEK), and electromechanical device that will extend the capabilities of existing fish traps, and convert them from indiscriminate traps into “smart traps” capable of targeting specific fish types. To eliminate lionfish bycatch, the FTEK will enable existing commercial spiny lobster traps to autonomously de ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Ride Performance Assessment System (RPAS)

    SBC: DFUZION, INC.            Topic: 151FR9

    To address FRA’s requirements of measuring rail vehicle suspension displacement and integrating this into existing accelerometer-based ride quality systems, dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS will leverage the investment and research already made by FRA in its sponsored portable ride quality meter. By extending the ride quality dat ...

    SBIR Phase II 2017 Department of Transportation
  6. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  7. Train Reporting And Inspection INdex (TRAIN)

    SBC: BENTEN TECHNOLOGIES, INC.            Topic: 151FR5

    Benten Technologies proposes to develop a back-end schema-less, open source, cloud-based database with front-end browser-based, cross-platform JavaScript model library to support locomotive inspection data collection. TRAIN will allow for the logging of inspection data for all types of locomotives including steam, diesel, diesel-electric, and electric locomotives by railroad and locomotive manufac ...

    SBIR Phase II 2017 Department of Transportation
US Flag An Official Website of the United States Government