You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  2. Advanced Concept Basalt Fiber Reinforcement for Concrete

    SBC: Research & Technology Corp            Topic: N/A

    Extensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...

    SBIR Phase I 1996 Department of Transportation
  3. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. An Intermodal Operations Planning & Coordination System

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    This proposed activity will conduct case studies of six selected United States ports to determine whether an integrated terminal information system in each of them might deliver significant benefits to port operators, port users, and shippers. Using the experience of the railroad industry as a guide, problems and possibilities for integrating information flow will be examined. The final report w ...

    SBIR Phase I 1996 Department of Transportation
  5. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  6. MULTI-MODE TRANSIT ACCOUNTING".

    SBC: Paperless Acct. Trans. Tech            Topic: N/A

    FEASIBILITY OF USING MICROPROCESSOR BASED PERSONAL TOKEN DEVICES INDUCTIVELY COUPLED FOR BI-DIRECTIONAL INFORMATION FLOW WILL BE STUDIED FOR TRANSIT FARE COLLECTION AND ACCOUNTING. A SIMPLE MICROPROCESSOR BASED USER TOKEN WILL BE DEVELOPED PRINCIPALLY TO TEST COUPLING AND SOFTWARE CONCEPTS. HARDWARE AND SOFTWARE INTERFACES TO EXISTING TURNSTILE EQUIPMENT WILL BE STUDIED. RESEARCH ON APPROPRIATE RE ...

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government