You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel X-Ray Detection for Large Field of View (FOV) Very High Resolution Computed Tomography (CT) Inspection and Evaluation

    SBC: IMAGING TECH, INC.            Topic: N/A

    Not Available We will prototype an original methodology for search and knowledge discovery in electronic databases. The methodology represents a quantum leap with respect to ongoing work on Latent Semantic Indexing (LSI), and is based on the Backus Gilbert method for inversion. This provides the framework for the implementation of a practical and scalable algorithm. We recast the measurement o ...

    SBIR Phase I 1999 Department of DefenseOffice of the Secretary of Defense
  2. N/A

    SBC: Wph Associates            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  3. Advanced Concept Basalt Fiber Reinforcement for Concrete

    SBC: Research & Technology Corp            Topic: N/A

    Extensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...

    SBIR Phase I 1996 Department of Transportation
  4. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  5. MULTI-MODE TRANSIT ACCOUNTING".

    SBC: Paperless Acct. Trans. Tech            Topic: N/A

    FEASIBILITY OF USING MICROPROCESSOR BASED PERSONAL TOKEN DEVICES INDUCTIVELY COUPLED FOR BI-DIRECTIONAL INFORMATION FLOW WILL BE STUDIED FOR TRANSIT FARE COLLECTION AND ACCOUNTING. A SIMPLE MICROPROCESSOR BASED USER TOKEN WILL BE DEVELOPED PRINCIPALLY TO TEST COUPLING AND SOFTWARE CONCEPTS. HARDWARE AND SOFTWARE INTERFACES TO EXISTING TURNSTILE EQUIPMENT WILL BE STUDIED. RESEARCH ON APPROPRIATE RE ...

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government