You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
An Inexpensive Structural Core Material for Composite Bridges
SBC: Polymer Bridge Systems, Inc. Topic: N/APolymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...
SBIR Phase I 1996 Department of Transportation -
Advanced Concept Basalt Fiber Reinforcement for Concrete
SBC: Research & Technology Corp Topic: N/AExtensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...
SBIR Phase I 1996 Department of Transportation -
MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER
SBC: LOCUS, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation