Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  2. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  3. Feasibility of and Techniques for CORSIM Model Computer-Based Training

    SBC: Pacific Animated Imaging            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  4. Advanced Concept Basalt Fiber Reinforcement for Concrete

    SBC: Research & Technology Corp            Topic: N/A

    Extensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...

    SBIR Phase I 1996 Department of Transportation
  5. Dynamic Intrusion Sensing System Using a High Speed Low Cost 3D Camera

    SBC: Robotronics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  6. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  7. LARGE AREA INSPECTION OF FIBERGLASS MARINE HULLS

    SBC: Industrial Quality, Inc.            Topic: N/A

    A PROGRAM IS PROPOSED TO DEVELOP AN INFRARED THERMAL INSPECTION APPLICATION FOR THE EXAMINATION OF BARE AND COATED FIBERGLASS HULL STRUCTURES. PRIOR WORK HAS DEMONSTRATED THE APPLICABILITY OF THE INFRARED APPROACH TO THE INSPECTION OF THIS TYPE OF MATERIAL. SEVERAL TECHNIQUESWILL BE EVALUATED FOR THE APPLICATION OF THE THERMAL LOAD NEEDED TO PERFORM THE TEST. INFRARED THERMOGRAPHY OFFERS VERY RADI ...

    SBIR Phase I 1991 Department of Transportation
  8. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    USCG SOLICITATION 90-CG5 SUGGESTS EVALUATION OF KALMAN FILTERING A DIGITAL SIGNAL PROCESSING (DSP) TECHNIQUE, TO IMPROVE GEODETIC POSITIONING PROVIDED BY SINGLE CHAIN, AND EVENTUALLY, MULTICHAIN LORAN RECEIVERS. A DSP TECHNIQUE COMPARABLE TO KALMAN FILTERING HAS ALREADY BEEN IMPLEMENTED ON A SINGLE CHAIN LORAN RECEIVER, RESULTING IN SUBSTANTIAL GEODETIC POSITIONING IMPROVEMENTS IN NOISY, DYNAMIC E ...

    SBIR Phase II 1991 Department of Transportation
  9. OPERATOR ALERTNESS MONITORING USING THE PUPIL LIGHT REFLEX

    SBC: Pulse Electronics Inc            Topic: N/A

    A KEY FACTOR IN THE ABILITY TO SAFELY OPERATE A TRAIN IS THEOPERATOR ALERTNESS. OPERATOR ALERTNESS CAN BE COMPROMISED AS A RESULT OF FATIGUE, SUBSTANCE ABUSE OR EMOTIONAL DISTRESS. A DEVICE THAT WOULD OBJECTIVELY REPORT A PERSONS STATE OF ALERTNESS COULD INDICATE THAT PERSONS FITNESS FOR DUTY, FOR EXAMPLE, AT THE BEGINNING OF A SHIFT. IT IS WELL KNOWN THAT ALERTNESS IS HIGHLY CORRELATED WITH VARIO ...

    SBIR Phase II 1991 Department of Transportation
  10. USCG PV POWER SUPPLY

    SBC: Omitron, Inc.            Topic: N/A

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY PHOTOVOLTAIC POWER SUPPLY DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS TO REMOTE MONITORING STATIONS. DESIGN WORK WILL DEVELOP NEW APPROACHES TO THE UTILIZATION OF SOLAR CELL ARRAYS TO GENERATE ELECTRI ...

    SBIR Phase I 1991 Department of Transportation
US Flag An Official Website of the United States Government