You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  4. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Designing a mini-pilot scale unit for extraction and electrospinning of chitin as an adsorbent for uranium from seawater

    SBC: 525 Solutions, Inc.            Topic: 19g

    With the 4 billion tons of uranium estimated to be dissolved in the earth & apos;s oceans, an essentially unlimited resource is available to those with easy and affordable access. With decades of research towards the extraction of uranium from seawater, focus has been directed towards the selectivity of the adsorbent material, the cost of the material, and the ability of the adsorbent to be recycl ...

    SBIR Phase I 2013 Department of Energy
  6. GPU-Accelerated Multiphase Eulerian-Lagrangian Solver with Adaptive Mesh Refinement

    SBC: CFD RESEARCH CORPORATION            Topic: 14c

    Computer simulations of multi-phase flows are important for many applications. In the proposed work, we plan to advance Eulerian-Lagrangian methods by using Adaptive Mesh Refinement for multi-scale resolutions, and CPU-GPU parallelization to drastically reduce computing time. Eulerian-Lagrangian methods treat the gas/liquid phase as a continuum (Eulerian) fluid, and solid particulates as discrete ...

    SBIR Phase I 2013 Department of Energy
  7. High Reliability, Long Lifetime H- Ion Source

    SBC: Phoenix LLC            Topic: 32e

    In this work, a long lifetime (greater than 6 months) H- ion source capable of reliably delivering current greater than 10 mA will be designed. The immediate DoE need for this technology is a reliable DC H- ion source that will inject an ion beam into the proposed Project X particle accelerator at Fermi National Laboratory. There are several other basic science, medical, energy, and industrial ...

    SBIR Phase I 2013 Department of Energy
  8. Reduced Activation Tungsten for Fusion

    SBC: Plasma Processes, LLC            Topic: 27a

    Tungsten and its alloys are candidates for plasma facing component heat sinks and armor due to their low sputtering rate, high melting point, high thermal conductivity, high strength at elevated temperatures and low tritium inventory. However during service, the plasma facing components will be exposed to a high flux of 14MeV neutrons from the plasma and low energy neutrons from the blanket, whic ...

    SBIR Phase I 2013 Department of Energy
  9. Development Of Ultra-Low Noise, Wide Bandwidth, High Gain Transimpedance Amplifiers For Experimental And Commercial Detection Systems

    SBC: XANTHO TECHNOLOGIES LLC            Topic: 28a

    Many detectors - including solid-state particle detectors, microchannel plates, and photodiodes - output small current signals that require amplification and conversion to a voltage. Current-to-voltage converters (I/Vs) are widely utilized in experimental and commercial applications for this task. Numerous detection systems require wide bandwidth, ultra-low noise, high gain, and linear amplificati ...

    SBIR Phase I 2013 Department of Energy
  10. Vacuum Glazing with Glass Bonding Able to Withstand ASTM-2190

    SBC: V-Glass, INC            Topic: 03f

    Vacuum glazing has been on the market for over a decade, but its performance is poor, and its cost too high for wide adoption. Both issues stem from the use of a hard glass edge seal, which requires a high temperature manufacturing process, and which does not flex to accommodate outer pane contraction in winter weather. Lack of a low-cost, flexible seal has prevented successful commercialization o ...

    SBIR Phase I 2013 Department of Energy
US Flag An Official Website of the United States Government