You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intelligent In-Line Power Disconnect System
SBC: Integrated Solutions for Systems, Inc. Topic: HSB0131005This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...
SBIR Phase I 2013 Department of Homeland Security -
Quick Disconnect System for Power Distribution Hardening and Resiliency
SBC: STREAMLINE AUTOMATION LLC Topic: HSB0131005Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...
SBIR Phase I 2013 Department of Homeland Security -
ARGUS: Scalable And Reliable RF sensing for Long-Duration Personnel Tracking
SBC: Intelligent Automation, Inc. Topic: HSB0131001A recent U.S. Government Accountability Office report noted that that less than 1 percent of the 4,000-mile long border between the United States and Canada is under the operational control of U.S. Border Patrol. The large scale, and environmental conditions of the Northern Border pose specific technical challenges to securing the border. In this proposal, we detail a novel mesh networked RF senso ...
SBIR Phase I 2013 Department of Homeland Security -
Non-freezing Portable Vehicle Wash Tunnels
SBC: Integrated Solutions for Systems, Inc. Topic: HSB0121001Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...
SBIR Phase II 2013 Department of Homeland Security -
Virtual Shooter
SBC: Radiance Technologies, Inc. Topic: HSB0121004The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...
SBIR Phase II 2013 Department of Homeland Security -
Sensor-Smart Affordable Autonomous Robotic Platforms (SAARP)
SBC: ROBOTIC RESEARCH OPCO LLC Topic: HSB0121006Sensor-smart Affordable Autonomous Robotic Platforms (SAARP) is developing low cost autonomous robotic platforms to perform searching, mapping, and navigation tasks with minimal operator interaction. These inexpensive robotic platforms can quickly be deployed by first responders to provide a wide range of capabilities for a variety of missions; search and rescue, carrying sensors to determine env ...
SBIR Phase II 2013 Department of Homeland Security -
Low Ground Clearance Vehicle Detection and Warning System
SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION Topic: 131FR1Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...
SBIR Phase I 2013 Department of Transportation -
Low Ground Clearance Vehicle Detection and Warning System
SBC: Intelligent Automation, Inc. Topic: 131FR1The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...
SBIR Phase I 2013 Department of Transportation -
Pedestrian Auto Enforcement Program (PAEP)
SBC: POLARIS SENSOR TECHNOLOGIES INC Topic: 122FH3We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...
SBIR Phase I 2013 Department of Transportation -
Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information
SBC: Intelligent Automation, Inc. Topic: 081FH6This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...
SBIR Phase II 2013 Department of Transportation