You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Creating Spatial Disorientation in Flight Simulation

    SBC: CONTINUUM DYNAMICS INC            Topic: 122FA1

    Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...

    SBIR Phase I 2013 Department of Transportation
  2. Pedestrian Auto Enforcement Program (PAEP)

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: 122FH3

    We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...

    SBIR Phase I 2013 Department of Transportation
  3. An Intermodal Operations Planning & Coordination System

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    This proposed activity will conduct case studies of six selected United States ports to determine whether an integrated terminal information system in each of them might deliver significant benefits to port operators, port users, and shippers. Using the experience of the railroad industry as a guide, problems and possibilities for integrating information flow will be examined. The final report w ...

    SBIR Phase I 1996 Department of Transportation
  4. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  5. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  6. DIFFERENTIALLY DRIVEN GENERATORS (DDG)

    SBC: Transmission Technology Co Inc            Topic: N/A

    TRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...

    SBIR Phase I 1985 Department of Transportation
  7. OPERATIONS

    SBC: Transmission Technology Co Inc            Topic: N/A

    COST OF CARGO HANDLING OPERATIONS CAN BE REDUCED BY EQUIPMENT THAT USES LESS TIME AND ENERGY TO PERFORM AND RANDREQUIRES LESS MANPOWER TO OPERATE, MONITOR, AND MAINTAIN. ONE OBJECTIVE OF THIS PROPOSAL IS TO EVOLVE A PRELIMINARY DESIGN OF A REPRESENTATIVE PIECE OF MACHINERY, NAMELY A MOORING/WARPING AUTOMATIC TENSIONING WINCH USING ADVANCED ELECTRO-MECHANICAL TECHNOLOGY, ELIMINATING HYDRAULICS AND ...

    SBIR Phase I 1985 Department of Transportation
  8. WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT.

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT. THIS IN TURN LEADS TO THE REQUIREMENT FOR AN INTEGRATED TRACK MAINTENANCEFORECASTING AND PLANNING SYSTEM THAT WILL ENABLE TRACK MAIN TENANCE SUPERVISORS TO EFFECTIVELY PLAN THEIR MAINTE ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government