You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  4. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Smart Sensing for Integrated Low Power Radiological Protection

    SBC: Radiance Technologies, Inc.            Topic: MDA12006

    Billions of dollars have been invested by the United State to acquire the most technologically advanced military hardware in history, and, thereby provide battlefield advantages to military personnel. Protection of our sophisticated weapons systems and their components is critical for the continued maintenance of our technological advantages. Detecting and counteracting the newest methods of rever ...

    SBIR Phase I 2013 Department of DefenseMissile Defense Agency
  6. Modeling High Explosive (HE) Detonation Response and Resulting Debris/Shrapnel Generation from Submunitions Warheads

    SBC: PeopleTec, Inc.            Topic: MDA12008

    PeopleTec, Inc., a Woman-Owned Small Business (WOSB), teamed with SECOTEC and ITT Exelis to provide an innovative and economical solution to Missile Defense Agency (MDA) requirements for evaluating high explosive detonation response to impact. Led by principle investigator Mr. Tim Cowles, the goal of our effort is the development of an inexpensive test technique enabling the assessment of a wide ...

    SBIR Phase I 2013 Department of DefenseMissile Defense Agency
  7. Antenna Design in Hypersonic Plasma Environment

    SBC: CFD RESEARCH CORPORATION            Topic: MDA12010

    The goal of this SBIR project is to develop a computational tool for characterizing TM and GPS antennas mounted on plasma-engulfed hypersonic missiles and re-entry vehicles. The computational tool leverages coupled Computational Electro-Magnetics (CEM) and Computational Fluid Dynamics (CFD) techniques to simulate antenna operation following prediction of the missile or vehicle"s plasma environment ...

    SBIR Phase I 2013 Department of DefenseMissile Defense Agency
  8. Lightweight Communication Equipment for Interceptor Communications

    SBC: SCIENTIC INC            Topic: MDA12021

    Scientic, Inc. proposes to enhance interceptor communications through the utilization of an advanced miniature software defined radio (SDR) interceptor data link. Scientic is leading the industry in this area by utilizing commercial electronics developed for mobile computing and telephony, enhancing the capabilities of interceptor communications while reducing size and cost. Scientic personnel h ...

    SBIR Phase I 2013 Department of DefenseMissile Defense Agency
  9. Thermal Isolation of Solid Rocket Motor Exit Cone and Nozzle

    SBC: Plasma Processes, LLC            Topic: MDA12027

    Current strategic solid rockets motors, such as the SM-3 third stage rocket motor (TSRM), employ highly aluminized propellants with gas temperatures of approximately 6,500F. Carbon-carbon nozzle throats and carbon cloth phenolic (CCP) exit cones are commonly used to manage the propellant exhaust. However, heat transfer from these components to the nozzle housing and exit cone bond-line joint cur ...

    SBIR Phase I 2013 Department of DefenseMissile Defense Agency
  10. Advanced WCDMA Algorithms for Rapidly Changing Coverage Geometries

    SBC: W5 Technologies Inc            Topic: N122147

    WCDMA payloads on fast-moving platforms, such as on satellites in Molniya orbits or on UAVs, will likely be added to the battlefield to assure the warfighter of reliable, ubiquitous communications. The algorithms for handoffs, timing, and Doppler correction suitable for near-Geosynchronous platforms will not be suitable for these fast movers. Power control algorithms may or may not be suitable. Th ...

    SBIR Phase I 2013 Department of DefenseNavy
US Flag An Official Website of the United States Government