You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  4. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Improve pyrotechnic smoke formulations that produce low flame

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: A11aT026

    The objective of this research is to develop materials that replace the current generation of visible smoke formulations used by the U.S. military. In particular the materials must produce low or no flame so that they don't present a fire hazard, have relatively low toxicity, and are efficient. The efficiency is defined in a figure of merit that combines fill factor, yield factor, extinctio ...

    STTR Phase II 2013 Department of DefenseArmy
  6. Plasmonic MEMS Sensor Array

    SBC: Five Stones Research Corporation            Topic: A10aT002

    Sensor development researchers and engineers have perpetually sought novel methods to reduce sensor size and improve performance. Continued miniaturization of sensors through micromachining has enabled novel applications and introduced new paradigms for engineered systems to interact with the world. The challenge has always been to improve performance while continually reducing size. In the curren ...

    STTR Phase II 2013 Department of DefenseArmy
  7. High Fidelity Obscurant Modeling for Sensor Simulations

    SBC: SIMULATION TECHNOLOGIES, INC            Topic: A11aT004

    A technique that enables new methods of obscurant modeling with faster rendering while maintaining or improving physical fidelity is proposed. The proposed technique not only exhibits the statistics of voxel based obscurants, but matches real-world data as well. The main objective from Phase II efforts will be a further refinement of the flow field and particle technique of generating physically c ...

    STTR Phase II 2013 Department of DefenseArmy
  8. Pedestrian Auto Enforcement Program (PAEP)

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: 122FH3

    We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...

    SBIR Phase I 2013 Department of Transportation
  9. Aviators Intelligent Assistant

    SBC: Veloxiti, Inc.            Topic: A09124

    To meet the challenge of aiding the Army aviator with flying a complex aircraft in a dangerous region of airspace, Applied System Intelligence, Inc. (ASI), with participation from Sikorsky Aircraft Company (SAC), plans to add decision-aiding behaviors to the UH-60M Black Hawk helicopter in a system called Situational Awareness Fusion Enhancement Aid (SAFE-Aid). SAFE-Aid, an Intelligent Associate ...

    SBIR Phase II 2013 Department of DefenseArmy
  10. Tactical Power Plant Multi-Generator Intelligent Power Management Controller

    SBC: Radiance Technologies, Inc.            Topic: OSD12EP4

    "Diesel generators provide the majority of power generation in forward operating areas, frequently operating inefficiently and requiring excessive maintenance."Right size"generator operation, energy storage, renewable energy inputs, and intelligent power management strategies can greatly reduce fuel consumption and reduce the level and frequency of maintenance. Predictive load profiling strategie ...

    SBIR Phase I 2013 Department of DefenseArmy
US Flag An Official Website of the United States Government