You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Next Generation First Responder Communication Hub

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0151005

    As technology advances, First Responders are presented with a growing suite of increasingly sophisticated sensors and communication tools that provide vital, up-to-the-minute situational awareness information about their surroundings, location and status of nearby First Responders, and personal well-being. For example, programs such as the Department of Homeland Security (DHS) Apex Next Generation ...

    SBIR Phase II 2016 Department of Homeland Security
  2. Autonomous Indoor Navigation and Tracking of First Responders

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0161004

    Integrated Solutions for Systems, Inc. (IS4S), a leader in advanced PNT technology, proposes to develop a personal First Responder navigation and tracking system for use in GPS-limited or denied environments. The system will Track First Responder motion with inertial-based pedometry combined with visual odometry Have a modular and scalable architecture to incorporate, but not rely on, other aidin ...

    SBIR Phase I 2016 Department of Homeland Security
  3. HunchLab for EMS: A Low-Cost, Multi-Screen Performance Management Solution for Underserved Agencies

    SBC: Azavea Inc.            Topic: HSB0161006

    The goal of this research is to explore the feasibility of providing a low-cost Software-as-a-Service (SaaS) solution to assist underserved Emergency Medical Services (EMS) agencies of all sizes to better analyze and improve operations through real-time data analysis. Delivering a data analysis suite tuned to key performance indicators of EMS agencies as an online, cloud subscription will result ...

    SBIR Phase I 2016 Department of Homeland Security
  4. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  5. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  6. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  7. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  8. Subsurface Communications System for Robotics

    SBC: Sandia Research Corporation            Topic: DHS002

    Underground cross-border tunnels of all sizes and shapes are an increasingly important threat to our National security. Finding cross-border tunnels is a challenging task and once found, an additional challenge is secure and map the entire underground tunnel. Manned entry into these dangerous underground environments is a risky endeavor. The use of robotics offers a great improvement over human en ...

    SBIR Phase II 2013 Department of Homeland Security
  9. Pedestrian Auto Enforcement Program (PAEP)

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: 122FH3

    We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...

    SBIR Phase I 2013 Department of Transportation
  10. Developing a Standard Integrated Framework for Transit Assest Management Information

    SBC: Encada LLC            Topic: 131FT2

    Transit Agency Information required for managing Service centers on resources and assets that need to be available to operate the transit service as designed. An opportunity exists to design an Integrated Framework providing Service delivery and Maintenance Management Information to quantify the reliability and availability of the assets. This framework will incorporate modeling of the asset inven ...

    SBIR Phase I 2013 Department of Transportation
US Flag An Official Website of the United States Government