Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. AUTOMATED RAIL-BASED WHEEL GAUGE

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    INCREASED LOADS, HIGHER SPEEDS, AND A MORE EFFICIENT USE OF THE NATION'S FLEET OF LOCOMOTIVES AND FREIGHT CARS IS PUTTING INCREASED STRESS ON RAILROAD WHEELS. ALSO, A REDUCED WORKFORCE COMBINED WITH MORE RESTRICTED SIGHT LINES AND FEWER OPPORTUNITIES FOR WHEEL INSPECTION ARE REDUCING THE QUALITY OF THE INSPECTIONS THAT DO TAKE PLACE. MANY RAILROADS HAVE RESPONDED BY DEVELOPING OR PURCHASING PRODUC ...

    SBIR Phase I 1993 Department of Transportation
  2. Code Ray: Software Assurance Risk Management Framework for Hybrid Analysis Mapping

    SBC: APPLIED VISIONS, INC.            Topic: HSB0131002

    Two methods for analyzing software security risks are dynamic application security testing (DAST) - an outside in perspective - and static application security testing (SAST) - and inside out perspective. Both have shortfalls. DAST findings do not give insight into the root cause, making remediation time consuming. SAST tools give you full breadth, but warn of weaknesses that are not exploitable. ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Effective and Efficient GIS Use in Transportation Planning Using an Integrated Vector and Raster System and Pseudo English as a Programming Language

    SBC: Susquehanna Resources And            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. FEASIBILITY STUDY

    SBC: ANALYSIS & SIMULATION, INC.            Topic: N/A

    A NEED EXISTS TO DEVELOP SYSTEMS THAT CAN DETECT EMERGENCY AND/OR ABNORMAL OPERATIONS OF GENERAL AVIATION AIRCRAFT AND WARN OR ALERT THE PILOT OF ITS EFFECT AND RECOMMEND PROCEDURES. THE OBJECTIVE OF THIS PHASE I STUDY IS TO INVESTIGATE THE APPLICABILITY OF ARTIFICIAL INTELLIGENCE TECHNOLOGY TO THE SOLUTION OF THIS PROBLEM. THE APPROACH INVOLVES: (1) CLARIFICATION OF THE OVERALL EMERGENCY SITU- AT ...

    SBIR Phase I 1986 Department of Transportation
  5. IMPROVED RADIATION DETECRTOR: THE MULTI-DIMENSIONAL NEUTRON RADIOMETER

    SBC: Tensor Technology Inc.            Topic: N/A

    THIS PROPOSAL IS TO DETERMINE THE SPATIAL RESOLUTION OF A NEW TYPE OF MULTI-DIMENSIONAL X-Y DETECTOR WHICH PROVIDES THE POSITION IN AN X-Y PLANE OF NEUTRAL PARTICLE INTERACTIONS FOR USE IN AIRPORT SECURITY SYSTEMS FOR INSPECTION OF SEALED LUGGAGE.

    SBIR Phase I 1993 Department of Transportation
  6. INNOVATIVE TECHNIQUES OR SYSTEMS ARE NEEDED TO ATTENUATE FIRE RADIATION THROUGH WATER SPRAYS OR FOGS.

    SBC: BELTRAN, INC.            Topic: N/A

    INNOVATIVE TECHNIQUES OR SYSTEMS ARE NEEDED TO ATTENUATE FIRE RADIATION THROUGH WATER SPRAYS OR FOGS. ONE CONCEPT TO FIGHT FIRES INSIDE A CABIN IS THROUGH THE USE OF AN ON BORAD SPRINKLER SYSTEM. IN ORDER TO ENABLE HE DESIGN OF INNOVATIVE TECHNIQUES OR SYSTEMS TO ATTENUATE FIRE RADIATION, IT IS NECESSARY TO DEVELOP ENGINEERING TOOLS TO PREDICT ATTENUATION. IT IS NECESSARY TO RELATE VARIOUS DESIGN ...

    SBIR Phase I 1986 Department of Transportation
  7. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions For Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  8. Kappler SBIR-2012.2-005 Phase II

    SBC: Kappler, Inc            Topic: HSB0122005

    Kappler proposes to further define and develop a novel fabric composite that when integrated into Personal Protective Equipment (PPE) garments, provides protection to the wearer from multiple threats. The proposed research builds on the strength of the Phase I effort where Kappler validated the base fabric's capability to protect from chemical, biological, and flame hazards, and simultaneously be ...

    SBIR Phase II 2013 Department of Homeland Security
  9. MAGNETIC SHIELDING OF LSM AND EDS MODULES

    SBC: Intermagnetics General Corp            Topic: N/A

    MAGNETIC LEVITATION (MAGLEV) TRANSPORTATION SYSTEMS DEPEND ON MAGNETS OF INTENSE FLUX DENSITITES FOR PROPULSION, LEVITATION AND GUIDANCE. THERE ARE SOME CONCERNS REGARDING POSSIBLE PHYSIOLOGICAL, LEVITATION AND GUIDANCE. THERE ARE SOME CONCERNS REGARDING POSSIBLE PHYSIOLOGICAL DAMAGE TO HUMAN BEINGS EXPOSED TO HIGH MAGNETIC FIELDS. CONSEQUENTLY, THE ABILITY TO SHIELD MAGLEV MAGNET FIELSD FROM PASS ...

    SBIR Phase I 1993 Department of Transportation
  10. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions For Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
US Flag An Official Website of the United States Government