You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Pedestrian Auto Enforcement Program (PAEP)
SBC: POLARIS SENSOR TECHNOLOGIES INC Topic: 122FH3We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...
SBIR Phase I 2013 Department of Transportation -
Flowing Water Optical Power Meter for Laser Measurements
SBC: High Precision Devices, Inc. Topic: N/AHigh Precision Devices, Inc. (HPD) proposes to use the Phase I SBIR as a vehicle to develop and market a commercially viable 25kW flowing water optical power meter (FWOPM) for industrial, research, and government applications. Building upon existing and fundamentally sound NIST design, and without sacrificing quality or accuracy, HPD will reduce costs and increase manufacturability using best prac ...
SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology -
High Speed Imaging Spectropolarimeter for Dynamic Samples
SBC: POLARIS SENSOR TECHNOLOGIES INC Topic: 9020663RSpectroscopic ellipsometry is recognized as the gold standard in noncontact characterization of the refractive index and thickness of a thin optical film or film stack on a substrate. However, it suffers from a number of shortcomings, perhaps the most important of which is the time required to perform a single measurement. Moreover, manufacturers are interested in comprehensive evaluation of thin ...
SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology -
Delivering a Solar Flare Forecast Model that Improves Flare Forecast (Timing and Magnitude) Accuracy by 25%
SBC: NORTHWEST RESEARCH ASSOCIATES, INC. Topic: 943WMany activities and technological systems prevalent in today’s society – air traffic control and air travel, the power grids, communications, deep-water drilling operations, human spaceflight – are vulnerable to the effects of sudden flares from our Sun. Because the propagation speed for flare emission is the speed of light, it is necessary to forecast these events in order to mitigate thei ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Digital Waveform-Based System for Acoustic Emission Measurement for Nondestructive Testing of Structural Steel
SBC: Digital Wave Corp. Topic: N/ADigital Wave Corporation proposed to develop a novel nondestructive testing (NDT) system for high speed acquisition and analysis of wide band acoustic emission (AE) waveforms. The system will provide the capability to detect, identify and locate crack growth in loaded steel structures. This system will incorporate the new high fidelity sensor developed by the Federal Highway Administration and a ...
SBIR Phase I 1996 Department of Transportation -
"Transportation Planning Decision Support Systems"
SBC: In Motion Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
An Inexpensive Structural Core Material for Composite Bridges
SBC: Polymer Bridge Systems, Inc. Topic: N/APolymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...
SBIR Phase I 1996 Department of Transportation -
IMPROVED RADIATION DETECRTOR: THE MULTI-DIMENSIONAL NEUTRON RADIOMETER
SBC: Tensor Technology Inc. Topic: N/ATHIS PROPOSAL IS TO DETERMINE THE SPATIAL RESOLUTION OF A NEW TYPE OF MULTI-DIMENSIONAL X-Y DETECTOR WHICH PROVIDES THE POSITION IN AN X-Y PLANE OF NEUTRAL PARTICLE INTERACTIONS FOR USE IN AIRPORT SECURITY SYSTEMS FOR INSPECTION OF SEALED LUGGAGE.
SBIR Phase I 1993 Department of Transportation -
DEVELOPMENT OF A DIFFERENTIAL GPS NAVIGATION FILTER WITH AUTONOMOUS FAILURE DETECTION
SBC: THE NAVSYS CORPORATION Topic: N/ATHIS PROPOSAL DESCRIBES AN INNOVATIVE FILTERING TECHNIQUE THAT CAN BE USED TO DETECT AND REJECT OUT-OF-TOLERANCE MEASUREMENTS FROM A DIFFERENTIAL GPS NAVIGATION SOLUTION. THE TECHNIQUE CAN BE APPLIED FOR BOTH MOBILE AND STATIC APPLICATIONS AND COULD BE INTEGRATED INTO SHIPBOARD OR REFERENCE STATION GPS RECEIVERS. USING THE FILTER DESIGN PROPOSED, ERRORS CAUSED BY MULTIPATH, SATELLITE, RECEIVER ORR ...
SBIR Phase II 1991 Department of Transportation -
VESSEL TRACKING SYSTEM EQUIPMENT
SBC: THE NAVSYS CORPORATION Topic: N/AN/A
SBIR Phase I 1991 Department of Transportation