You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...

    SBIR Phase II 2013 Department of Transportation
  2. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...

    SBIR Phase II 2013 Department of Transportation
  3. Very High Speed Third Rail Insulator Cleaning

    SBC: MINI, LLC            Topic: 07FT4

    This Phase IIB proposal will accelerate the commercialization of the Phase II project that developed the Vohrtex insulator cleaner. The Phase II cleaner used self-spinning nozzles which require oversized offset jets to provide sufficient reaction force to make the nozzle spin. The oversized jets damage the surface finish of the insulators. This Phase IIB project will use small pneumatic, electric ...

    SBIR Phase II 2013 Department of Transportation
  4. Coating Existing Concrete Barriers to Reduce Rollover Potential

    SBC: NANOSONIC INC.            Topic: 121FH1

    The objective of this DoT SBIR program is to further establish the technical foundation of low friction HybridSil® Slippery Overturn Automobile Protection (SOAP) coatings on concrete barriers for drastic reductions in vehicle rollover potential and significantly increased concrete impact durability thus, enabling the rapid commercial integration of these coatings. To meet this challenge, NanoSoni ...

    SBIR Phase II 2013 Department of Transportation
  5. Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion

    SBC: HARMONIA HOLDINGS GROUP, LLC            Topic: 111FH2

    Our goal is to create a demonstrable software system that we call IntelliFusion, which fuses Connected Vehicle data with data from traditional inductive loop detectors and uses this data to improve traffic control at intersections across the country. Our work will improve the safety of intersections and improve the mobility of traffic through adaptive traffic control which uses data produced by I ...

    SBIR Phase II 2013 Department of Transportation
  6. A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines

    SBC: Generation 2 Materials Technology Llc            Topic: 111PH2

    There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...

    SBIR Phase II 2012 Department of Transportation
  7. Dynamic Non-Contact 3D Measurement System for Rollover Testing

    SBC: PHOTON-X, INC.            Topic: 07NH2

    During Phases I and II, Photon-X successfully demonstrated the feasibility of applying its patented Spatial Phase Imaging technology to the problem of non-contact 3D imaging during a rollover test and delivered a viable prototype system. During Phase IIB, Photon-X will continue to refine the system in preparation for commercialization. Photon-X will use this opportunity to add an additional camer ...

    SBIR Phase II 2012 Department of Transportation
  8. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  9. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  10. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government