You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Coating Existing Concrete Barriers to Reduce Rollover Potential
SBC: NANOSONIC INC. Topic: 121FH1The objective of this DoT SBIR program is to further establish the technical foundation of low friction HybridSil® Slippery Overturn Automobile Protection (SOAP) coatings on concrete barriers for drastic reductions in vehicle rollover potential and significantly increased concrete impact durability thus, enabling the rapid commercial integration of these coatings. To meet this challenge, NanoSoni ...
SBIR Phase II 2013 Department of Transportation -
Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion
SBC: HARMONIA HOLDINGS GROUP, LLC Topic: 111FH2Our goal is to create a demonstrable software system that we call IntelliFusion, which fuses Connected Vehicle data with data from traditional inductive loop detectors and uses this data to improve traffic control at intersections across the country. Our work will improve the safety of intersections and improve the mobility of traffic through adaptive traffic control which uses data produced by I ...
SBIR Phase II 2013 Department of Transportation -
Dynamic Non-Contact 3D Measurement System for Rollover Testing
SBC: PHOTON-X, INC. Topic: 07NH2During Phases I and II, Photon-X successfully demonstrated the feasibility of applying its patented Spatial Phase Imaging technology to the problem of non-contact 3D imaging during a rollover test and delivered a viable prototype system. During Phase IIB, Photon-X will continue to refine the system in preparation for commercialization. Photon-X will use this opportunity to add an additional camer ...
SBIR Phase II 2012 Department of Transportation -
A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines
SBC: Generation 2 Materials Technology Llc Topic: 111PH2There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...
SBIR Phase II 2012 Department of Transportation -
IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE
SBC: GINER INC Topic: N/AFOR CATHODIC PROTECTION SYSTEMS TO BE SUCCESSFUL IN MITIGATING CORROSION WITHOUT CAUSING HYDROGEN EMBRITTLEMENT OF PRESTRESSING STEEL, THE AMOUNT OF POLARIZATION OF THE EMBEDDED STEEL MUST BE VERY ACCURATELY CONTROLLED. PRESENTLY AVAILABLE EMBEDDED REFERENCE ELECTRODES DO NOT HAVE THE LONG TERM STABILITY OR RELIABILITY RE@UIRED TO MONITOR AND CONTROL THE AMOUNT OF POLARIZATION WITH THE ACCURACY RE ...
SBIR Phase II 1993 Department of Transportation -
"Sensor Systems for Hazardous Conditions in High Speed Rail"
SBC: ENSCO Inc Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
NEURAL NETWORK LANE CHANGE DETECTOR
SBC: Exodyne Technologies, Inc. Topic: N/AN/A
SBIR Phase II 1993 Department of Transportation -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AAVAILABLE NDT TECHNIQUES CAN DETECT RELATIVELY LARGE DEFECTS IN DRILLED SHAFTS. TO PROVIDE INFORMATION ABOUT THE SIZE OR SHAPE OF THE DEFECT, SOME TECHNIQUES REQUIRE EMBEDDING SENSORS INSIDE OF HAVING ACCESS ALONG THE LENGTH OF THE SHAFTS. SUCH REQUIREMENTS LIMIT THEIR APPLICABILITY TO NEWLY CONSTRUCTED SHAFTS AND ALSO COMPLICATE THE DESIGN AND INSTALLATION PROCESSES. IN THE STRESS WAVE APPROACH, ...
SBIR Phase II 1994 Department of Transportation