You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    The Next Generation Equipment Committee (NGEC) developed a standard for specifying the use of an Ethernet based digital train line (DTL) network to replace the COMM line for passenger trains. These specifications are PRIIA 305‐919 Digital Train Line Hardware and PRIIA 305‐920 Digital Train Line Software. The intent Is to eventually allow for the improvement of passenger train control. DTL spec ...

    SBIR Phase II 2017 Department of Transportation
  2. Development of Innovative Welding for High Performance Bridge Steel

    SBC: KAI, LLC            Topic: 132FH1

    With this research, we would like to provide new materials joining methods to the DOT. This will be achieved with a pulse energy store that has already demonstrated game changing capability in welding a wide variety of metals and alloys. The process we are proposing is known as Homopolar Welding. The weld is created by a solid state fusion welding process whereby high current is passed through the ...

    SBIR Phase II 2017 Department of Transportation
  3. A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines

    SBC: Generation 2 Materials Technology Llc            Topic: 111PH2

    There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...

    SBIR Phase II 2012 Department of Transportation
  4. Dynamic Non-Contact 3D Measurement System for Rollover Testing

    SBC: PHOTON-X, INC.            Topic: 07NH2

    During Phases I and II, Photon-X successfully demonstrated the feasibility of applying its patented Spatial Phase Imaging technology to the problem of non-contact 3D imaging during a rollover test and delivered a viable prototype system. During Phase IIB, Photon-X will continue to refine the system in preparation for commercialization. Photon-X will use this opportunity to add an additional camer ...

    SBIR Phase II 2012 Department of Transportation
  5. NEURAL NETWORK LANE CHANGE DETECTOR

    SBC: Exodyne Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1993 Department of Transportation
US Flag An Official Website of the United States Government