You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost Bridge Structural Monitoring Technology / Turning Structural Monitoring Data into Decision Making Information

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    This is a supplemental Phase II proposal submitted to DOT for additional funding and performance period extension of the on-going DOT Phase II project (contract # DTRT57-10-C-10027). The overall objective of the Supplemental Phase II effort is to complete the development of the sensor system capable of continuously monitoring the integrity of bridge structures, conduct field operation validation ...

    SBIR Phase II 2013 Department of Transportation
  2. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside inspection, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their sequences attached to the powered unit. An automated trailer VIN id ...

    SBIR Phase II 2013 Department of Transportation
  3. Very High Speed Third Rail Insulator Cleaning

    SBC: MINI, LLC            Topic: 07FT4

    This Phase IIB proposal will accelerate the commercialization of the Phase II project that developed the Vohrtex insulator cleaner. The Phase II cleaner used self-spinning nozzles which require oversized offset jets to provide sufficient reaction force to make the nozzle spin. The oversized jets damage the surface finish of the insulators. This Phase IIB project will use small pneumatic, electric ...

    SBIR Phase II 2013 Department of Transportation
  4. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  5. Dynamic Intrusion Sensing System Using a High Speed Low Cost 3D Camera

    SBC: Robotronics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government