You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low Ground Clearance Vehicle Detection and Warning System
SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION Topic: 131FR1Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...
SBIR Phase I 2013 Department of Transportation -
Low Ground Clearance Vehicle Detection and Warning System
SBC: Intelligent Automation, Inc. Topic: 131FR1The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...
SBIR Phase I 2013 Department of Transportation -
Developing a Standard Integrated Framework for Transit Assest Management Information
SBC: Encada LLC Topic: 131FT2Transit Agency Information required for managing Service centers on resources and assets that need to be available to operate the transit service as designed. An opportunity exists to design an Integrated Framework providing Service delivery and Maintenance Management Information to quantify the reliability and availability of the assets. This framework will incorporate modeling of the asset inven ...
SBIR Phase I 2013 Department of Transportation -
Climate Impact Visualization Tools Using Virtual 3D City for Community Based Planning and Outreach
SBC: Intelligent Automation, Inc. Topic: 931RCIntelligent Automation, Inc. proposes an innovative visualization tool that transforms online GIS mappers into a climate impact assessment and planning tool that allows planners to visualize the impact of storm surges with sea level rise and coastal erosion using a 3D virtual city. The goal is to assist planners and emergency services to adapt to climate change at three tiers: i) Tier 3 (Long-te ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Motor Vehical Crash Costing Technology
SBC: ARCCA, INC. Topic: N/AWith the advent of widely available PC technology, crash safety information can be cost-effectively disseminated to millions of people in an engaging and educational way. With an enticing and informative PC application, data about damages, costs, injuries and death can be personalized and grasped by anyone, particularily young drivers developing new driving behaviors. ARCCA's proposed system wil ...
SBIR Phase I 1996 Department of Transportation -
Digital Waveform-based System for AE Measurement for NDT
SBC: Dvp, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Feasibility of and Techniques for CORSIM Model Computer-Based Training
SBC: Pacific Animated Imaging Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Instrumented Anchor Pin for Heavy Truck Brake
SBC: Stratcom International Llc Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Innovative Energy Absorbing Composite Utility Poles
SBC: United Dynamics, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation